{"id":2277,"date":"2026-10-07T00:14:39","date_gmt":"2026-10-07T00:14:39","guid":{"rendered":"http:\/\/ritoks.com\/"},"modified":"2026-10-07T00:14:39","modified_gmt":"2026-10-07T00:14:39","slug":"single-vs-three-phase-energy-meters","status":"publish","type":"post","link":"https:\/\/ritoks.com\/cs\/single-vs-three-phase-energy-meters\/","title":{"rendered":"Single-Phase vs Three-Phase DIN Rail Energy Meters"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A single phase vs three phase energy meter comparison begins with the circuit being measured. The first question is whether the measurement point is single-phase or three-phase, and which conductors are actually available. That decision changes the input architecture, wiring evidence and commissioning plan. A meter selected from a headline label alone can create an avoidable mismatch even when its display and rail mounting look familiar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide compares the buying questions for single-phase and three-phase DIN rail energy meters. It keeps the meter type separate from direct versus transformer-connected measurement, communications and billing requirements. Each final choice must be supported by the exact meter diagram and order code.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">P\u0159ehled podklad\u016f pro rozhodnut\u00ed<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Oblast p\u0159ezkumu<\/th><th>Co zaznamen\u00e1v\u00e1 kupuj\u00edc\u00ed<\/th><th>D\u016fkazy, o kter\u00e9 je t\u0159eba po\u017e\u00e1dat<\/th><\/tr><\/thead><tbody><tr><td>System at measurement point<\/td><td>Document actual phase and neutral arrangement<\/td><td>Approved single-line diagram<\/td><\/tr><tr><td>Current input<\/td><td>Identify direct connection or transformer interface<\/td><td>Exact-meter input and wiring documentation<\/td><\/tr><tr><td>V\u00fdstup<\/td><td>Define displayed and exported data<\/td><td>Register map and interface document<\/td><\/tr><tr><td>Instalace<\/td><td>Allow space, access and test points<\/td><td>Dimensioned drawing and commissioning plan<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure data-spectra-id=\"spectra-ef787da0-de4b-4a11-8d09-00503061125d\" class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1400\" height=\"1050\" src=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01.webp\" alt=\"Single-Phase vs Three-Phase DIN Rail Energy Meters input diagram: supply architecture, conductors, measurement point, meter input\" class=\"wp-image-2275\" srcset=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01.webp 1400w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-300x225.webp 300w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-1024x768.webp 1024w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-768x576.webp 768w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-16x12.webp 16w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-600x450.webp 600w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption class=\"wp-element-caption\">Map the project inputs for DIN rail energy meters before screening candidates.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Start at the measurement point<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A site can contain both single-phase loads and a three-phase distribution system. The meter belongs to a specific measurement point, so describe the conductors and the circuit boundary there rather than naming only the upstream supply. A single-phase feeder serving one machine is a different metering problem from a three-phase feeder supplying a panel of mixed loads.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Provide a current single-line diagram, location of the meter, feeder identity, available conductors and the operational question the meter must answer. If one meter is expected to represent a group of circuits, show how those circuits enter the metering boundary.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What single-phase metering must establish<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For a single-phase application, confirm the supply arrangement and the exact terminal path through or into the meter. A product described as single-phase does not establish whether it is direct connected, transformer connected, two-wire in the expected sense or suitable for every local circuit. The terminals, input limits and installation instructions govern.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A compact meter may be convenient for branch-circuit visibility, but the panel design still needs a suitable protective and isolation arrangement, conductor space and an accessible reading or communications method. Check those items in the assembly plan.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What three-phase metering adds<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Three-phase energy measurement involves multiple voltage and current relationships. The wiring scheme must match the actual system arrangement, including whether a neutral is present and how the current inputs are obtained. A label such as three-phase is only the start of the specification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Compare the exact meter wiring diagram with the panel single-line drawing. Mark each phase, current path and reference connection, and have the design team confirm that the selected scheme measures the intended feeder rather than a convenient subset of conductors.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Separate phase count from current interface<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Phase count and current input method are separate decisions. A meter can have a direct-connected path or use external current transformers, depending on its design. The presence of a CT elsewhere in the panel does not prove the proposed meter accepts its secondary output or ratio setting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If transformers are required, record their ratio, output, accuracy and burden evidence with the meter input specification. For a direct-connected option, review conductor routing, terminals and the specific permitted connection. Do not infer one interface from a neighboring model.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Define the data the project actually needs<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Some projects need only a local energy reading. Others need interval data, alarms, pulse outputs or a network connection to a building or industrial system. These are independent requirements that may change the order code or wiring.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">State the required measurements, update expectations, communication medium, register documentation and integration owner. A meter with a port is not automatically a working monitoring system: the receiving software must interpret the correct data and the commissioning team must verify the mapping.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Compare offers using one measurement brief<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ask each supplier to respond to the same measurement point, wiring architecture and data requirement. An offer for a single-phase branch meter is not equivalent to a three-phase feeder meter, even when both quote energy measurement. Likewise, a meter that needs external CTs is not a direct substitute for one designed for direct connection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Record the complete meter code, accessories, transformer requirements, communications option and documents supplied. Keep differences visible instead of normalizing every quotation to a generic energy-meter line item.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Commission the actual installation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">At commissioning, verify the connection against the approved diagram and check the sign and plausibility of measured values under known operating states. Compare the meter reading with the intended circuit boundary, not just with a powered display.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where data is exported, confirm addressing, register interpretation, scaling and the destination system. Capture the configured parameters and as-built wiring so a replacement can be reviewed against the same evidence later.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vytvo\u0159te soubor d\u016fkaz\u016f pro p\u0159esn\u00fd model<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A category or product-family page helps locate relevant options; it does not by itself approve one variant. For DIN rail energy meters, keep the full proposed order code, current datasheet, terminal or mounting drawing, operating instructions and any project calculation together. Read the conditions attached to each rating or function. If the evidence belongs to a neighboring model, request the correct document instead of carrying the claim across.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Projektov\u00fd t\u00fdm odpov\u00edd\u00e1 za vstupn\u00ed \u00fadaje syst\u00e9mu a krit\u00e9ria p\u0159ej\u00edmky. Dodavatel odpov\u00edd\u00e1 za podklady k nab\u00edzen\u00e9 polo\u017ece. P\u0159i technick\u00e9m posouzen\u00ed p\u0159i\u0159a\u010fte ka\u017ed\u00fd povinn\u00fd po\u017eadavek k p\u0159esn\u011b tomu dokumentu a revizi, kter\u00e9 jej spl\u0148uj\u00ed. Chyb\u011bj\u00edc\u00ed pole ozna\u010dte jako otev\u0159en\u00e9, podm\u00edn\u011bn\u00e9 nebo nepodporovan\u00e9. T\u00edm vznikne sledovateln\u00e9 rozhodnut\u00ed a zabr\u00e1n\u00ed se tomu, aby p\u0159\u00edzniv\u00e1 celkov\u00e1 hodnota zakryla nekompatibiln\u00ed propojen\u00ed nebo instala\u010dn\u00ed podm\u00ednku.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Porovnejte kompletn\u00ed nab\u00eddky<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Polo\u017eka<\/th><th>Z\u00e1znam v porovn\u00e1n\u00ed<\/th><th>D\u016fvod<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eka k objedn\u00e1n\u00ed<\/td><td>\u00dapln\u00fd k\u00f3d, varianty a p\u0159ilo\u017een\u00e9 p\u0159\u00edslu\u0161enstv\u00ed<\/td><td>Zabra\u0148uje vytv\u00e1\u0159en\u00ed p\u0159edpoklad\u016f na \u00farovni rodiny<\/td><\/tr><tr><td>Shoda \u017e\u00e1dost\u00ed<\/td><td>P\u00edsemn\u00e1 odpov\u011b\u010f na ka\u017ed\u00fd podn\u011bt k projektu<\/td><td>Zajist\u00ed, aby v\u00fdjimky z\u016fstaly viditeln\u00e9<\/td><\/tr><tr><td>Dokumentace<\/td><td>Technick\u00fd list, v\u00fdkres, n\u00e1vod a revize<\/td><td>Odkazy na n\u00e1roky k nab\u00edzen\u00e9 polo\u017ece<\/td><\/tr><tr><td>Otev\u0159en\u00e9 body<\/td><td>Vlastn\u00edk a term\u00edn pro vyjasn\u011bn\u00ed<\/td><td>Zabra\u0148uje ml\u010denliv\u00e9mu souhlasu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure data-spectra-id=\"spectra-4b99a713-18d5-411b-aa6a-539d18fe90fa\" class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1400\" height=\"1050\" src=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02.webp\" alt=\"Single-Phase vs Three-Phase DIN Rail Energy Meters evidence diagram: wiring diagram, ct requirement, data output, commissioning\" class=\"wp-image-2276\" srcset=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02.webp 1400w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-300x225.webp 300w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-1024x768.webp 1024w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-768x576.webp 768w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-16x12.webp 16w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-600x450.webp 600w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption class=\"wp-element-caption\">Compare DIN rail energy meters offers using exact-model evidence and open questions.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Pro ka\u017edou cenovou nab\u00eddku pou\u017eijte stejn\u00fd zad\u00e1vac\u00ed list. Obchodn\u00ed podm\u00ednky, jako jsou cena a dodac\u00ed lh\u016fta, lze porovnat a\u017e po sjednocen\u00ed technick\u00e9ho rozsahu. Nevypln\u011bn\u00e9 dopl\u0148ky, nepodlo\u017een\u00e9 parametry nebo nevyjasn\u011bn\u00e9 p\u0159edpoklady ohledn\u011b zapojen\u00ed nepova\u017eujte za ekvivalent zdokumentovan\u00e9 nab\u00eddky. Pokud je navr\u017eena alternativa, zeptejte se, kter\u00e9 vstupn\u00ed \u00fadaje se m\u011bn\u00ed, a opakujte p\u0159\u00edslu\u0161nou kontrolu.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kontrola instalace a p\u0159evzet\u00ed<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">P\u0159ed instalac\u00ed se ujist\u011bte, \u017ee dodan\u00fd \u0161t\u00edtek, kompletn\u00ed k\u00f3d a p\u0159\u00edslu\u0161enstv\u00ed odpov\u00eddaj\u00ed schv\u00e1len\u00e9mu z\u00e1znamu. Porovnejte svorky, zp\u016fsob upevn\u011bn\u00ed, p\u0159\u00edstup k vodi\u010d\u016fm a ve\u0161ker\u00e9 uveden\u00e9 orientace s p\u0159esn\u00fdmi pokyny. V\u00fdrobek, kter\u00fd se fyzicky jev\u00ed jako podobn\u00fd schv\u00e1len\u00e9 verzi, m\u016f\u017ee m\u00edt p\u0159esto odli\u0161nou elektrickou konfiguraci, mo\u017enost ovl\u00e1d\u00e1n\u00ed nebo zku\u0161ebn\u00ed podm\u00ednky.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Plan an as-built check that addresses the project&#8217;s real risks. This may involve wiring against the approved diagram, functional response, measurements under representative operating states and confirmation of any communication or alarm feature. Record the conditions and results. The acceptance plan should come from the application and supplier evidence, not from a generic article checklist.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kontroln\u00ed seznam pro \u017e\u00e1dost o cenovou nab\u00eddku<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Identify the circuit, equipment and location that DIN rail energy meters must serve.<\/li><li>P\u0159ilo\u017ete syst\u00e9mov\u00fd v\u00fdkres a provozn\u00ed stavy, kter\u00e9 definuj\u00ed danou aplikaci.<\/li><li>Record supply architecture and its source document.<\/li><li>Zaznamenejte vedouc\u00ed a jejich zdrojov\u00e9 dokumenty.<\/li><li>Record measurement point and its source document.<\/li><li>Record meter input and its source document.<\/li><li>Confirm the exact-model evidence for wiring diagram.<\/li><li>Confirm the exact-model evidence for ct requirement.<\/li><li>Confirm the exact-model evidence for data output.<\/li><li>Confirm the exact-model evidence for commissioning.<\/li><li>Vy\u017e\u00e1dejte si \u00fapln\u00fd k\u00f3d objedn\u00e1vky, p\u0159\u00edslu\u0161enstv\u00ed, v\u00fdkresy a revizi technick\u00e9ho listu.<\/li><li>Zeptejte se na v\u00fdjimky, p\u0159edpoklady, n\u00e1hradn\u00ed \u0159e\u0161en\u00ed a nevy\u0159e\u0161en\u00e9 technick\u00e9 ot\u00e1zky.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">\u017d\u00e1dost o nab\u00eddku by m\u011bla b\u00fdt natolik konkr\u00e9tn\u00ed, aby na ni dodavatel mohl odpov\u011bd\u011bt, ani\u017e by si musel dom\u00fd\u0161let chyb\u011bj\u00edc\u00ed \u00fadaje o projektu. Pokud nen\u00ed n\u011bkter\u00fd z\u00e1sadn\u00ed \u00fadaj dosud zn\u00e1m, ozna\u010dte jej jako ot\u00e1zku a uve\u010fte, kdo jej ur\u010d\u00ed. Nep\u0159em\u011b\u0148ujte p\u0159edpoklad na hodnocen\u00ed, prohl\u00e1\u0161en\u00ed o shod\u011b ani schv\u00e1len\u00fd zp\u016fsob instalace.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Co ovliv\u0148uje rozhodnut\u00ed<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A decision can change when the source arrangement, load behavior, environment, installation geometry or required function changes. Revisit the selected DIN rail energy meters whenever one of those inputs moves outside the approved brief. Recheck the order code and the exact evidence affected by the change; do not rely on a previous approval for a circuit that now asks the component to do different work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Vedejte stru\u010dnou historii reviz\u00ed zad\u00e1vac\u00ed dokumentace projektu, odpov\u011bd\u00ed dodavatel\u016f a seznamu schv\u00e1len\u00fdch v\u00fdjimek. Tento z\u00e1znam pom\u00e1h\u00e1 odd\u011blen\u00edm technick\u00e9ho v\u00fdvoje, n\u00e1kupu a uveden\u00ed do provozu pracovat na z\u00e1klad\u011b stejn\u00e9 verze. Je to obzvl\u00e1\u0161t\u011b u\u017eite\u010dn\u00e9 v p\u0159\u00edpad\u011b, \u017ee dojde k revizi nab\u00eddky, je nab\u00eddnuta n\u00e1hrada nebo se po prvn\u00edm srovn\u00e1n\u00ed zm\u011bn\u00ed n\u00e1vrh rozvad\u011b\u010de.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u010casto kladen\u00e9 ot\u00e1zky<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Can a three-phase meter replace a single-phase meter?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Only if the exact model documentation permits the intended single-phase wiring and the project accepts that configuration. Do not infer compatibility from the broader family name.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Does a meter with RS485 always support the required platform?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Obtain the exact protocol and register documentation, then test the intended points in the receiving system.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Are direct-connected and CT-operated meters interchangeable?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Their input arrangements and installation evidence differ. Match the meter and any CTs as one measured system.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Souvisej\u00edc\u00ed str\u00e1nky RITOKS<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Informace o kontextu produktov\u00e9 rodiny najdete na <a href=\"https:\/\/ritoks.com\/cs\/product-category\/electrical-measurement-monitoring\/din-rail-energy-meters\/\">Elektrick\u00e1 m\u011b\u0159en\u00ed a monitorov\u00e1n\u00ed<\/a>. Mezi souvisej\u00edc\u00ed zve\u0159ejn\u011bn\u00e9 str\u00e1nky produkt\u016f pat\u0159\u00ed <a href=\"https:\/\/ritoks.com\/cs\/products\/dds1108-single-phase-din-rail-energy-meter\/\">Dds1108 Single Phase Din Rail Energy Meter<\/a>, <a href=\"https:\/\/ritoks.com\/cs\/products\/dts5158b-three-phase-four-wire-din-rail-energy-meter\/\">Dts5158b Three Phase Four Wire Din Rail Energy Meter<\/a>, <a href=\"https:\/\/ritoks.com\/cs\/products\/2p-single-phase-rs485-modbus-din-rail-energy-meter\/\">2p Single Phase Rs485 Modbus Din Rail Energy Meter<\/a>. P\u0159i porovn\u00e1v\u00e1n\u00ed navrhovan\u00e9 polo\u017eky pou\u017eijte jejich aktu\u00e1ln\u00ed dokumenty s p\u0159esn\u00fdm ozna\u010den\u00edm modelu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chcete-li z\u00edskat cenovou nab\u00eddku na m\u00edru pro konkr\u00e9tn\u00ed aplikaci, <a href=\"https:\/\/ritoks.com\/cs\/contact-us\/\">za\u0161lete zad\u00e1n\u00ed projektu spole\u010dnosti RITOKS<\/a> spolu s v\u00fd\u0161e uveden\u00fdmi sch\u00e9maty a otev\u0159en\u00fdmi ot\u00e1zkami.<\/p>","protected":false},"excerpt":{"rendered":"<p>Single-Phase vs Three-Phase DIN Rail Energy Meters. Review application inputs, exact-model documents and RFQ questions before selecting DIN rail energy meters.<\/p>","protected":false},"author":1,"featured_media":2274,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ritoks_resource_detail_renderer":"viox","ritoks_resource_product_cat_term_id":128,"footnotes":""},"categories":[68],"tags":[],"class_list":["post-2277","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-measurement-monitoring"],"acf":[],"spectra_blocks_featured_image_url":{"thumbnail":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01-150x150.webp","width":150,"height":150},"medium":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01-300x169.webp","width":300,"height":169},"medium_large":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01-768x432.webp","width":768,"height":432},"large":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01-1024x576.webp","width":1024,"height":576},"full":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01.webp","width":1600,"height":900}},"spectra_blocks_author_info":{"display_name":"RITOKS","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/6d7d0fc73468198f994ab13ef6eb6558c53b6ed1ad86364d5165efe8bdf8eb4a?s=96&d=mm&r=g","author_link":"https:\/\/ritoks.com\/cs\/author\/dazzlingwqbgmail-com\/","description":""},"_links":{"self":[{"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/posts\/2277","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/comments?post=2277"}],"version-history":[{"count":1,"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/posts\/2277\/revisions"}],"predecessor-version":[{"id":2278,"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/posts\/2277\/revisions\/2278"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/media\/2274"}],"wp:attachment":[{"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/media?parent=2277"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/categories?post=2277"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ritoks.com\/cs\/wp-json\/wp\/v2\/tags?post=2277"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}