Automatic Transfer Switches for Power Source Changeover · Technical Explainer
ATS Source Sensing: Matching Voltage Faults to Transfer Logic

Separate source measurement from the decision to transfer
ATS source voltage sensing, undervoltage and phase loss functions need an exact controller definition. A controller measures particular inputs, judges whether a source is acceptable using supported conditions, and then applies its operating mode and transfer logic. A voltage indication or an automatic-transfer label does not prove that every phase, neutral fault or voltage abnormality is detected.
The useful procurement deliverable is a source-validity table tied to the selected controller and wiring configuration. It should state the quantities measured, fault and recovery criteria, applicable qualification delays, and expected response when the other source is unavailable. This article concentrates on the conditions that trigger a decision, rather than prescribing universal transfer-delay settings.
RITOKS lists the G2R-63 DIN-rail automatic transfer switch y ATS-M motorised changeover switches. Their offered control arrangement must be documented individually. Do not assume that a motorised switching mechanism alone includes an autonomous controller, or that both families have identical source-monitoring functions.
Define the network and sensing connections first
Start with the actual source configuration. Record whether each source is single-phase or three-phase, whether a neutral is present, and the voltage reference required by the offered controller. Line-to-line and line-to-neutral measurements are different quantities. A threshold attached to one cannot simply be relabelled as the other.
Obtain the approved sensing diagram for the selected variant. It should identify the measured conductors, sensing supply arrangement and any relevant protective or interface components. Keep this separate from the power-pole diagram where necessary: a power path can have several conductors without proving that the controller evaluates each of them.
Socomec's ATyS C35 manual explicitly maps different network configurations to sensing quantities in its metering section. This is a useful model for the information to request. Its terminal numbers, allowed networks and wiring details apply to C35, not to G2R-63 or ATS-M.
Ask the supplier how the configuration is selected and recorded. A controller left in a different network mode can interpret its inputs differently from the intended design. Commissioning should therefore include a documented configuration check, not only confirmation that the displayed voltage looks plausible.
An available-source flag represents defined criteria
A source-availability indication is a conclusion made by the controller, not a complete description of the supply. Ask which measurements and conditions contribute to it. A basic device may evaluate fewer quantities than a more capable controller, and optional functions can depend on the exact version.
Schneider Electric's TransferPacT function table distinguishes controller versions and their monitoring functions. Its example shows why a family name is not enough to establish the complete monitoring scope. Do not transfer its phase-rotation, voltage-unbalance or other function availability to an unrelated switch.
For each source, identify the intended normal range and the controller's supported way of judging it. Keep the measurement accuracy, displayed resolution and acceptance thresholds distinct in the specification. A display with several digits does not by itself establish an appropriately accurate fault decision.
The acceptance record should state the configured source-validity conditions explicitly. Avoid writing only healthy or failed without explaining what those states mean. This makes it possible to compare the controller's indication with the applied test condition and the expected response.

Undervoltage detection and recovery are separate events
Ask how the controller recognizes an undervoltage condition and how it decides that voltage has recovered. The decision can depend on threshold settings, hysteresis and persistence criteria supported by the device. A brief excursion and a sustained abnormal condition need not produce the same response.
Socomec's C35 voltage-sensing section distinguishes source loss and source return using configured conditions and timers. The relevant principle is that entry into a failed state and return to an available state must both be defined. Its values and menu behavior are not universal ATS settings.
Keep a source-recovery decision separate from retransfer permission. The preferred source may be judged available before the operating mode allows the load to return to it. If the specification requires manual retransfer or another inhibit condition, include that additional decision in the state table.
Do not select a fault threshold from a blog example. The connected loads' requirements, supply characteristics, controller capabilities and project criteria should determine the approved settings. Record the reference quantity and units beside every entered value so percentages and absolute voltages are not silently mixed.
Phase loss, phase sequence and neutral loss are different questions
For a three-phase application, ask whether the selected controller evaluates the required phases and how it treats a missing phase. Then ask separately about phase sequence and voltage unbalance if those conditions matter to the connected equipment. Detecting one condition does not establish all three functions.
Neutral supervision requires its own evidence. Socomec's C35 manual cautions that neutral loss may remain undetected in a balanced network for that controller arrangement. The lesson is not that every ATS has the same limitation; it is that voltage sensing must not be advertised as universal neutral-loss protection without specific evidence.
Do not use the number of power poles as the monitoring-function specification. A switched neutral, an unswitched neutral and a monitored neutral represent separate system questions. Obtain the exact controller and switching diagrams and retain the terminology used by the manufacturer.
Where a required fault is outside the offered controller's scope, leave it as an open design item. A separate monitoring device may need consideration by the responsible designer, but this article does not prescribe an additional device or imply that an undocumented alarm input solves the requirement.
Write the state table before testing the switch
| Test condition | Controller evidence to record | Logic question to resolve |
|---|---|---|
| Preferred source acceptable | Measured quantities and available flag | Which operating mode selects it? |
| Preferred source undervoltage | Supported fault indication and qualification | Is transfer allowed and is alternate acceptable? |
| Required phase missing | Exact supported detection behavior | What response is specified? |
| Preferred source recovered | Recovery condition and available flag | Automatic return, manual return or inhibit? |
| Both sources unacceptable | Both source-state indications | What position and alarm behavior are documented? |
This is an evidence-request table, not a prescribed sequence for every ATS. Fill its expected-response column from the selected device's manual and approved project requirements. If a row concerns an unsupported function, mark that clearly instead of placing an assumed pass result in the test form.
TransferPacT's Auto Mode guide distinguishes auto-return and non-return behavior. It illustrates that available sources and the configured operating mode jointly affect the outcome. Its exact timer resets and return sequence remain specific to that product.

Keep command, switch position and load supply observable
A command to transfer is not the same observation as a completed switch movement. Determine what feedback the offered assembly provides and how a failure to reach the requested position is reported. Keep controller state, command output and switching-position feedback as separate items in the commissioning record.
Similarly, a switch-position indication does not by itself establish acceptable voltage at every downstream load. The project test plan should define the observations required at the load side. This is especially important when the purpose of the test is service continuity rather than only controller logic.
Identify what happens if the controller's supply disappears while both sources are unavailable. Request the documented power-supply arrangement and retained functions. Do not infer backup operating capability from a communication connector or from another manufacturer's auxiliary-supply example.
Where a generator is involved, distinguish a generator-start request from a source being ready to accept load. The controller needs the documented conditions for recognizing the alternate source. A start signal alone does not establish acceptable generator voltage, frequency or successful transfer.
Verify faults through an approved commissioning method
Use a competent person's approved test procedure and appropriate equipment to verify the required source-state decisions. This article is not an instruction to remove energized conductors or create a live neutral fault. Fault simulation, controller test functions and actual supply tests can verify different aspects and should be identified in the report.
Record the applied condition, controller configuration, indicated source state, command, feedback and observed outcome. Include the tested mode and relevant delay settings, but avoid turning an observed interval into a universal controller-performance claim. Repeatability depends on the documented test conditions.
Confirm recovery as well as failure. A successful transfer-away test leaves the return logic unresolved if recovery was never checked. Test the requested automatic or manual return behavior and retain any limitations of the method used.
The final record should separate verified functions from documentation-only checks and unresolved items. Keep test results associated with the offered controller revision and configuration. A future replacement should not inherit the old record merely because its front panel looks similar.
Send an inquiry with a complete sensing requirement
For G2R-63 or an ATS-M assembly, provide source topology, nominal quantities, connected-load requirements, required fault supervision and intended operating mode. Ask for the exact controller scope, sensing diagram, supported fault and recovery settings, and switching/feedback interfaces.
Then request a source-validity and expected-response table for the offered arrangement. This turns automatic transfer from a broad product label into a specific, checkable control function. Any gap in phase, neutral or recovery supervision remains visible for design review instead of becoming an unsupported assumption.
Source notes
- Socomec. ATyS C35 Installation and Operating Manual,2026 official revision; metering and voltage-sensing sections reviewed2026-09-30. No terminal numbers, ratings or threshold recommendations transferred.
- Schneider Electric. TransferPacT Controller Functions and Characteristics; version differences reviewed2026-09-30.
- Schneider Electric. TransferPacT Auto Mode; auto-return/non-return distinctions reviewed2026-09-30. No universal timing or seamless-transfer claim.