{"id":2089,"date":"2026-10-04T02:54:58","date_gmt":"2026-10-04T02:54:58","guid":{"rendered":"http:\/\/ritoks.com\/"},"modified":"2026-10-04T06:52:25","modified_gmt":"2026-10-04T06:52:25","slug":"scr-rectifier-module-heatsink-mounting-checklist","status":"publish","type":"post","link":"https:\/\/ritoks.com\/fr\/scr-rectifier-module-heatsink-mounting-checklist\/","title":{"rendered":"Montage du dissipateur thermique du module SCR et du redresseur : liste de contr\u00f4le des v\u00e9rifications"},"content":{"rendered":"<p class=\"wp-block-paragraph\">SCR and Rectifier Module Heatsink Mounting: Evidence Checklist begins with a controlled application record, not a catalog headline. Buyers should define the real system, installation and service conditions before comparing candidate products. Every decisive claim then needs support from the exact proposed order code.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This evidence checklist organizes the documents needed to review mounting between a power semiconductor module and a heatsink. It does not prescribe a universal torque, flatness, compound thickness, insulation stack or temperature limit; those values must come from the exact module, heatsink, interface and assembly instructions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Aper\u00e7u des \u00e9l\u00e9ments d'aide \u00e0 la d\u00e9cision<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Zone d'\u00e9valuation<\/th><th>L'acheteur doit pr\u00e9ciser<\/th><th>Pi\u00e8ces justificatives requises<\/th><\/tr><\/thead><tbody><tr><td>Geometry<\/td><td>Baseplate, holes, keep-outs and contact area<\/td><td>Exact module and heatsink drawings<\/td><\/tr><tr><td>Interface<\/td><td>Approved material, preparation and application method<\/td><td>Exact installation instruction<\/td><\/tr><tr><td>Fixation<\/td><td>Hardware, sequence, tool and tightening value<\/td><td>Manufacturer mounting procedure<\/td><\/tr><tr><td>Isolation<\/td><td>Required electrical isolation and thermal consequences<\/td><td>Approved insulation-system evidence<\/td><\/tr><tr><td>Thermal verification<\/td><td>Loss, temperatures, airflow and acceptance points<\/td><td>Calculation plus assembled test<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure data-spectra-id=\"spectra-3b8a589a-48b4-4ef7-ac37-4f566a00df8f\" class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" height=\"1050\" width=\"1400\" src=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-01.webp\" alt=\"Power Module Heatsink application input map covering exact drawings, surface condition, interface material, fastening method\" class=\"wp-image-2087\" srcset=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-01.webp 1400w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-01-300x225.webp 300w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-01-1024x768.webp 1024w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-01-768x576.webp 768w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-01-16x12.webp 16w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-01-600x450.webp 600w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption class=\"wp-element-caption\">Map the application inputs before comparing Power Module Heatsink candidates.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Freeze the Exact Module and Heatsink Pair<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Record the full module order code and the exact heatsink extrusion, machining drawing or finished part number. Similar module footprints can differ in hole position, baseplate shape, terminal clearance or mounting instruction. A generic family outline is not enough for machining approval.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Overlay the two controlled drawings and identify the intended contact area, mounting holes, terminal keep-outs, conductor approach and service space. If an adapter plate is proposed, treat it as a separate thermal and mechanical component with its own evidence.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Inspect the Contact Surfaces<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The heat-transfer interface depends on the assembled surfaces. Review the exact requirements for flatness, finish, cleanliness and damage limits from the relevant manufacturer documents. Do not substitute a shop rule or a value copied from a neighboring module.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Define how incoming heatsinks and modules are protected from dents, burrs and contamination. Establish an inspection method that can identify a surface problem before fastening hides it.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Specify the Interface Material as a System Component<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Thermal compound, pad or isolating material affects contact resistance, assembly process and electrical behavior. Use only a material and application method supported by the complete design. More material is not automatically better, and an improvised layer can prevent proper seating.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Record supplier, grade, thickness or application control, coverage area, storage and replacement rules where applicable. If the interface also provides insulation, confirm its electrical role and how clamping affects its performance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Follow the Exact Fastening Procedure<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Fastener type, washer arrangement, tightening sequence and final torque influence contact pressure and module stress. These details must come from the exact mounting instructions and the approved mechanical design. This article intentionally provides no universal torque number.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Use a controlled tool and document the assembly sequence. If the design requires staged tightening, recheck or settling time, include it in the work instruction. Do not use terminal-torque data as mounting-torque data.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Include Insulation and Clearance in the Review<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Determine whether the module base, heatsink or surrounding assembly must be electrically isolated. Add insulators, bushes or barriers only as part of an approved design because they can alter both thermal performance and mechanical stack height.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Check terminal clearance, creepage and service access using the applicable project requirements and exact drawings. The heatsink may be physically large enough but still unsuitable if terminals or busbars cannot be routed safely.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Verify the Finished Thermal Assembly<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Calculate semiconductor loss with exact device data and real operating duty. Carry that heat through every interface to the cooling medium. For forced air, include the actual fan, duct, obstruction and inlet condition rather than a free-air assumption.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Test representative assemblies at the specified load and environment. Define measurement locations and acceptance limits before testing. If the module, interface, machining, fan or enclosure changes, assess whether the verification remains applicable.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cr\u00e9er un dossier de preuves bas\u00e9 sur un mod\u00e8le exact<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Create one approval record for the proposed Power Module Heatsink order code. Put each project requirement beside the supplier document that answers it. Preserve the exact datasheet, drawing, curve, table, instruction or selection output used, including its revision or retrieval date. A category page can establish family context, but it cannot prove an exact rating, construction, terminal arrangement or system combination.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">V\u00e9rifiez que chaque description accept\u00e9e correspond bien au m\u00eame article pouvant faire l'objet d'une commande. Ne combinez pas le nombre maximal par famille d'une variante, le sch\u00e9ma d'une autre et une caract\u00e9ristique optionnelle d'une troisi\u00e8me. Indiquez clairement les champs non renseign\u00e9s afin qu'ils restent visibles lors des revues techniques et commerciales.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">S\u00e9parer les donn\u00e9es d'entr\u00e9e du projet des \u00e9l\u00e9ments probants relatifs au produit<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project team defines the application: source, load, duty, environment, controls, mounting, service and required functions. The supplier identifies an exact Power Module Heatsink and supports it with exact documents. Neither side should fill a gap by inference from appearance, a shared family name or one matching headline value.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Geler le dossier d'appel d'offres pendant la comparaison des devis. Si la charge \u00e9lectrique, l'environnement, le mode de refroidissement, le bo\u00eetier, l'installation ou les fonctionnalit\u00e9s requises changent, \u00e9mettre un dossier r\u00e9vis\u00e9 et demander \u00e0 chaque fournisseur de reconfirmer sa proposition.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">D\u00e9finir le protocole de r\u00e9ception avant de passer commande<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Write the acceptance record before a preferred Power Module Heatsink is chosen. Include the project inputs, proposed order code, included accessories, document revisions, exceptions, assumptions and the person responsible for resolving each open point. This prevents the technical basis from being reconstructed after price negotiations have already narrowed the choice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Distinguez les exigences obligatoires des pr\u00e9f\u00e9rences et des options futures. Une condition obligatoire doit s'appuyer sur des preuves directes ou sur une d\u00e9cision technique document\u00e9e. Une pr\u00e9f\u00e9rence peut influencer la comparaison, mais ne doit pas \u00eatre pr\u00e9sent\u00e9e comme une exigence de s\u00e9curit\u00e9 ou de conformit\u00e9. Les options futures ne doivent \u00eatre coch\u00e9es que lorsque le projet les pr\u00e9voit r\u00e9ellement, car les fonctionnalit\u00e9s optionnelles peuvent modifier le code de commande, les bornes, les dimensions ou les documents justificatifs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">V\u00e9rifier l'article livr\u00e9 et l'ensemble fini<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Incoming inspection should compare the delivered Power Module Heatsink, labels, accessories and documents with the approved record. Do not accept a same-family replacement solely because its appearance or one rating matches. Record any substitution and repeat the affected review before installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Une fois le montage termin\u00e9, v\u00e9rifiez les fonctions et les conditions qui ne peuvent \u00eatre valid\u00e9es uniquement \u00e0 partir de la documentation des composants. Cette v\u00e9rification peut porter, selon le cas, sur l'ajustement m\u00e9canique, le c\u00e2blage par rapport au sch\u00e9ma homologu\u00e9, le comportement des commandes, les temp\u00e9ratures, le d\u00e9bit d'air, les alarmes ou l'acc\u00e8s pour la maintenance. D\u00e9finissez des \u00e9tats de fonctionnement repr\u00e9sentatifs et des crit\u00e8res d'acceptation dans le plan d'essai du projet, plut\u00f4t que d'imposer des limites universelles dans le bon de commande.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Erreurs courantes en mati\u00e8re de passation de march\u00e9s<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Selecting a Power Module Heatsink from one headline value while the application context remains incomplete.<\/li><li>Utilisation d'une courbe, d'un circuit, d'un dessin ou d'un revendication provenant d'un code de commande voisin.<\/li><li>Consid\u00e9rer une page de cat\u00e9gorie, une photo de produit ou une taille nominale comme une preuve de compatibilit\u00e9 certaine.<\/li><li>En supposant qu'un accessoire, une fonctionnalit\u00e9 du syst\u00e8me ou un r\u00e9sultat de coordination soit inclus sans documentation.<\/li><li>Approuver un rempla\u00e7ant sans refaire l'examen des aspects \u00e9lectriques, m\u00e9caniques et des \u00e9l\u00e9ments de preuve.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Comblez ces lacunes avant de comparer les prix et les d\u00e9lais de livraison. Une offre peut rester int\u00e9ressante sur le plan commercial m\u00eame si elle est incompl\u00e8te sur le plan technique, mais les \u00e9l\u00e9ments manquants ne doivent pas \u00eatre occult\u00e9s dans le devis.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment comparer les offres des fournisseurs<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Zone d'\u00e9valuation<\/th><th>L'acheteur doit pr\u00e9ciser<\/th><th>Pi\u00e8ces justificatives requises<\/th><\/tr><\/thead><tbody><tr><td>R\u00e9f\u00e9rence de commande<\/td><td>Article propos\u00e9 complet et accessoires inclus<\/td><td>Fiche technique et champ d'application pr\u00e9cis<\/td><\/tr><tr><td>Correspondance d'application<\/td><td>Conditions d'exploitation et environnementales d\u00e9clar\u00e9es<\/td><td>R\u00e9ponse \u00e9crite \u00e0 chaque exigence<\/td><\/tr><tr><td>Int\u00e9gration m\u00e9canique<\/td><td>Montage, bornes, d\u00e9gagements et entretien<\/td><td>Plans et instructions d\u00e9taill\u00e9s<\/td><\/tr><tr><td>Preuves \u00e9lectriques<\/td><td>Caract\u00e9ristiques nominales, courbes et topologie applicables<\/td><td>Documentation technique relative au mod\u00e8le Exact<\/td><\/tr><tr><td>Points en suspens<\/td><td>Inconnues, exceptions et hypoth\u00e8ses<\/td><td>Liste des pr\u00e9cisions dat\u00e9es<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure data-spectra-id=\"spectra-e7864284-9fd9-4a61-9dee-ce2496a861ff\" class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" height=\"1050\" width=\"1400\" src=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-02.webp\" alt=\"Power Module Heatsink evidence review covering device loss, contact path, heatsink, airflow test\" class=\"wp-image-2088\" srcset=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-02.webp 1400w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-02-300x225.webp 300w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-02-1024x768.webp 1024w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-02-768x576.webp 768w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-02-16x12.webp 16w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-body-02-600x450.webp 600w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption class=\"wp-element-caption\">Use an evidence matrix to keep Power Module Heatsink requirements, documents and unresolved questions aligned.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Normalize every Power Module Heatsink offer to the same application record. Keep document revisions, test conditions, included accessories and open questions beside each value. This makes differences in delivered scope visible and prevents a lower-cost but narrower offer from appearing equivalent to a complete proposal.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Processus d\u00e9cisionnel<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Figer les limites du syst\u00e8me et les \u00e9tats de fonctionnement.<\/li><li>Enregistrer les donn\u00e9es relatives aux param\u00e8tres \u00e9lectriques, m\u00e9caniques, environnementaux et d'entretien.<\/li><li>Choisissez un code de commande complet d'un candidat \u00e0 examiner.<\/li><li>V\u00e9rifier chaque affirmation cruciale \u00e0 la lumi\u00e8re des donn\u00e9es issues du mod\u00e8le exact.<\/li><li>R\u00e9soudre les exceptions et clarifier les hypoth\u00e8ses avant de proc\u00e9der \u00e0 une comparaison commerciale.<\/li><li>V\u00e9rifier l'ensemble fini lorsque les risques li\u00e9s \u00e0 l'application l'exigent.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Interrompez la proc\u00e9dure lorsqu'une donn\u00e9e essentielle est inconnue, que le mod\u00e8le cit\u00e9 est ambigu, qu'une sp\u00e9cification requise n'est \u00e9tay\u00e9e que par un autre fabricant ou un autre code de commande, ou que l'installation ne correspond \u00e0 aucun des cas document\u00e9s. Il s'agit l\u00e0 de lacunes techniques, et non de d\u00e9tails r\u00e9dactionnels.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Liste de contr\u00f4le pour la pr\u00e9paration d'un appel d'offres<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A useful RFQ for scr module heatsink mounting is concise enough to answer and complete enough to prevent silent assumptions. Identify unknown values as questions and require a full orderable code rather than a generic family recommendation.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>EXACT DRAWINGS<\/li><li>SURFACE CONDITION<\/li><li>INTERFACE MATERIAL<\/li><li>FASTENING METHOD<\/li><li>DEVICE LOSS<\/li><li>CONTACT PATH<\/li><li>HEATSINK<\/li><li>AIRFLOW TEST<\/li><li>Documents requis et modifications<\/li><li>Quantit\u00e9, destination et \u00e9tendue de la livraison demand\u00e9e<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Demandez au fournisseur d'indiquer s\u00e9par\u00e9ment les exclusions, les hypoth\u00e8ses et les options. Notez les quantit\u00e9s et la destination apr\u00e8s les donn\u00e9es techniques afin que les conditions commerciales ne masquent pas les questions techniques non r\u00e9solues.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Foire aux questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Can I select a Power Module Heatsink from one rating or size?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Non. La s\u00e9lection n\u00e9cessite le dossier de demande complet, les sp\u00e9cifications techniques pr\u00e9cises ainsi que toutes les conditions applicables en mati\u00e8re d'\u00e9lectricit\u00e9, de m\u00e9canique, de thermique, d'environnement et de documentation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Puis-je utiliser une page familiale comme justificatif d'autorisation ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Une page \u00ab Famille \u00bb est utile pour s'y retrouver. Le service charg\u00e9 de l'homologation doit se baser sur la fiche technique portant le code de commande exact, le plan, les instructions et les documents techniques sp\u00e9cifiques au projet.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Les mod\u00e8les d'apparence similaire sont-ils interchangeables ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pas syst\u00e9matiquement. Des bo\u00eetiers similaires peuvent comporter des circuits, des mat\u00e9riaux, des bornes, des caract\u00e9ristiques techniques ou des accessoires diff\u00e9rents. R\u00e9p\u00e9tez la v\u00e9rification pour chaque produit de remplacement.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Quels \u00e9l\u00e9ments doivent rester ouverts dans le devis ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Toute donn\u00e9e manquante relative au projet, toute affirmation non v\u00e9rifi\u00e9e concernant le mod\u00e8le exact, tout accessoire inclus dont la nature n'est pas claire ou toute condition d'installation non r\u00e9solue doit \u00eatre r\u00e9pertori\u00e9e comme un point en suspens plut\u00f4t que d'\u00eatre consid\u00e9r\u00e9e comme acquise.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ressources RITOKS associ\u00e9es et appels d'offres<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Parcourir le <a href=\"https:\/\/ritoks.com\/fr\/product-category\/thermal-management\/power-module-heatsinks\/\">Cat\u00e9gorie de produits : dissipateurs thermiques pour modules de puissance<\/a>, <a href=\"https:\/\/ritoks.com\/fr\/products\/aluminum-power-module-heatsink-scr-rectifier\/\">consulter la page principale du produit concern\u00e9<\/a>, <a href=\"https:\/\/ritoks.com\/fr\/products\/sf-forced-air-heatsink-power-modules\/\">Consulter l'option 2 des produits associ\u00e9s<\/a>. Ces pages fournissent des informations contextuelles d'ordre commercial ; la compatibilit\u00e9 exacte d\u00e9pend toutefois du dossier du projet et du code de commande indiqu\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lorsque le dossier technique sera pr\u00eat, <a href=\"https:\/\/ritoks.com\/fr\/contact-us\/\">envoyer le dossier de candidature et les pi\u00e8ces justificatives requises \u00e0 RITOKS<\/a> pour obtenir un devis d\u00e9taill\u00e9. La s\u00e9lection finale doit \u00eatre soumise \u00e0 l'approbation de l'ing\u00e9nieur de projet et conforme \u00e0 la documentation actuelle du fabricant.<\/p>","protected":false},"excerpt":{"rendered":"<p>Review module-to-heatsink mounting through exact drawings, interface, flatness, fastening, insulation, thermal calculation and assembled verification.<\/p>","protected":false},"author":1,"featured_media":2086,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ritoks_resource_detail_renderer":"viox","ritoks_resource_product_cat_term_id":137,"footnotes":""},"categories":[69],"tags":[],"class_list":["post-2089","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-enclosure-thermal-management"],"acf":[],"spectra_blocks_featured_image_url":{"thumbnail":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-hero-01-150x150.webp","width":150,"height":150},"medium":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-hero-01-300x169.webp","width":300,"height":169},"medium_large":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-hero-01-768x432.webp","width":768,"height":432},"large":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-hero-01-1024x576.webp","width":1024,"height":576},"full":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/scr-rectifier-module-heatsink-mounting-checklist-hero-01.webp","width":1600,"height":900}},"spectra_blocks_author_info":{"display_name":"RITOKS","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/6d7d0fc73468198f994ab13ef6eb6558c53b6ed1ad86364d5165efe8bdf8eb4a?s=96&d=mm&r=g","author_link":"https:\/\/ritoks.com\/fr\/author\/dazzlingwqbgmail-com\/","description":""},"_links":{"self":[{"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/posts\/2089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/comments?post=2089"}],"version-history":[{"count":2,"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/posts\/2089\/revisions"}],"predecessor-version":[{"id":2115,"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/posts\/2089\/revisions\/2115"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/media\/2086"}],"wp:attachment":[{"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/media?parent=2089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/categories?post=2089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ritoks.com\/fr\/wp-json\/wp\/v2\/tags?post=2089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}