“I²t” often appears beside a semiconductor fuse, but one isolated number is not a coordination decision. Buyers need to know whether it represents pre-arcing or total clearing energy, the current and voltage conditions under which it was determined, and how it relates to the protected semiconductor's own limits. A fuse can have the right nominal amperes while letting through too much energy under the fault scenario that matters. Conversely, a low figure copied from another test condition can make a proposal appear better than it is.
This guide provides a document checklist for a rectifier, converter or similar equipment RFQ. It does not calculate a fuse size or promise protection of a particular power device. RITOKS publishes the RS95 aR semiconductor fuse family, but its public family page does not provide a complete coordination curve and I²t table for every proposed application. The missing data must be obtained for an exact configuration before engineering approval.
What I²t Measures—and What It Does Not
I²t is the integral of current squared over time, often expressed in ampere-squared seconds. In fuse literature, it is a way to describe the thermal effect of a current event under specified conditions. It is not a standalone measure of current rating, voltage rating, interrupting ability or semiconductor survival. The usefulness of a stated value depends on what interval it covers and the test circuit.
Mersen's explanation of fuse clearing I²t distinguishes total clearing energy from peak current alone. IEC 60269-4:2024, the semiconductor-fuse supplementary standard, includes cut-off-current and I²t characteristics among the technical information relevant to fuse links. The standard's existence does not grant a particular RITOKS model a particular measured value.
For procurement, ask “Which I²t?” before comparing figures. If the answer is absent, the quote is not sufficiently specified for a semiconductor coordination check. A model code, utilization category and manufacturer data sheet should accompany the value.
Pre-Arcing Versus Total Clearing
Pre-arcing I²t covers the period until the fuse element begins to melt and form an arc. Total clearing I²t includes the subsequent arc-extinction period before current is fully interrupted. The second number is generally the relevant complete let-through interval when assessing fault energy passed to protected equipment. The two values are not synonyms and should not be placed in one comparison column without labels.
ある Eaton high-speed fuse data page publishes separate pre-arc and clearing I²t for one part and shows that clearing figures can vary with applied voltage. This is an example of the kind of documentation buyers should request, not a source of values for RS95. Do not transfer the Eaton example's numbers to a different manufacturer or fuse body.

Some catalogue tables offer one fixed pre-arcing value and a set of clearing values at different circuit conditions. If a seller gives only the smaller pre-arcing value, ask for the relevant clearing data as well. If a buyer sees “low I²t” in marketing language, request the chart and its test assumptions before treating the phrase as a protective guarantee.
The Circuit Conditions Behind the Figure
Applied voltage, AC or DC operation, fault-current level, power factor or DC time constant, and fuse design influence the clearing event. Even when two products list the same unit, figures obtained under different assumptions cannot be compared directly. A valid comparison requires a common circuit scenario or manufacturer guidance on translating the data to the intended application.
Start with the project one-line and the prospective short-circuit current at the fuse location. Record normal operating current and any inrush or repetitive duty separately. Identify the system voltage and whether the fuse must interrupt AC, DC or both. For AC, frequency and power-factor assumptions may matter; for DC, the circuit's time constant and the fuse's verified DC rating matter. Do not treat an AC rating as DC-capable by analogy.
その RITOKS RS95 page identifies aR protection in 50 Hz AC circuits and model-dependent voltage/current ranges. Its public information does not establish a DC rating or a universal I²t for the family. That boundary should remain visible in the technical submittal. If the project is a DC common bus, do not assume RS95 is suitable without exact manufacturer evidence.
The Semiconductor Side of Coordination
A fuse's let-through information is only half the comparison. The protected diode, thyristor, IGBT assembly or power module needs an applicable short-duration current or energy limit from its manufacturer. The semiconductor's data may be given for a specific waveform, junction starting temperature or pulse duration. The design engineer must assess whether those conditions match the credible fault and the fuse data being compared.
Do not use a module's continuous current rating as its allowable fault-energy limit. Do not assume a catalog headline “surge current” automatically covers the complete fuse-clearing event. Ask for the protected device's exact part number and data sheet, then record which published limit is being used and what conditions apply. If that information is unavailable, the supplier should mark the coordination decision open.
Coordination also includes the equipment architecture. A semiconductor may share a branch with other devices, and faults can originate at different locations. The engineer may need to examine upstream protection, parallel paths and the ability of the fuse to interrupt the actual prospective current. A fuse cannot be approved purely by comparing two I²t lines while ignoring where it is installed.
Utilization Class and Breaking Range Matter
The application class is part of the coordination record. The RITOKS RS95 is labelled aR; its published description is short-circuit protection for semiconductor equipment. In practical design, a partial-range aR fuse does not by itself establish protection against every lower overload. If other devices are assigned those duties, document them and verify the coordination. A gR fuse is a different class, and a general-purpose fuse is another question again.
The aR-versus-gR class difference is separate from this question. The semiconductor-fuse category identifies the wider selection set: voltage, current, breaking capacity, time-current data, mounting and coordination. This I²t guide is narrower. Its purpose is to stop an energy figure being extracted from the context that gives it meaning.
When reviewing alternatives, compare the same class and fault duty unless a qualified designer has approved a class change. A lower quoted I²t cannot rescue a fuse whose breaking range, voltage rating or mounting is wrong for the circuit.
A Document Set for the RFQ
Request these items as a coherent package:
- Approved circuit one-line with the fuse position and AC or DC system details.
- Normal operating and credible prospective fault-current data at that position.
- Protected semiconductor exact part number, relevant data sheet and fault-energy or surge-current limit with conditions.
- Proposed fuse exact manufacturer part number, utilization category, voltage and current ratings, breaking capacity and mounting drawing.
- Manufacturer time-current and cut-off-current curves for that fuse.
- Pre-arcing I²t and total clearing I²t data, each labelled with circuit conditions.
- Any upstream, downstream or overload-protection arrangement needed for the complete system.
- Manufacturer application guidance or engineering calculation explaining the selected coordination margin.
A salesperson may not have every field on a product page. That is acceptable as an open RFQ item, not as permission to fill it with a number from a different series. Put the outstanding document and its owner in the submittal register. This keeps procurement moving without silently approving an unverified protection scheme.
Compare Candidate Data on Like Terms
Use a side-by-side table only after the source and condition of each value is known:
| フィールド | Candidate A | Candidate B | Common check |
|---|---|---|---|
| Exact fuse part and class | Document reference | Document reference | Same application duty? |
| AC/DC voltage rating | Stated condition | Stated condition | Meets system voltage? |
| Prospective current and capacity | Rated/tested range | Rated/tested range | Covers actual fault? |
| Pre-arcing I²t | Source and condition | Source and condition | Same quantity? |
| Total clearing I²t | Source and condition | Source and condition | Same voltage and fault case? |
| Device limit | Exact semiconductor document | Exact semiconductor document | Applicable waveform/temperature? |

An empty cell means unresolved evidence, not zero. Do not rank candidates by the smallest visible number if one manufacturer has reported pre-arcing energy and the other total clearing energy. Ask the engineer to normalize the comparison or request equivalent manufacturer curves.
Common Misreadings
One common error is to read the fuse's ampere rating as an I²t value. Current is one parameter; I²t expresses a time-integrated effect under a specified event. Another is to copy an I²t number from a product family overview onto every body size and rated-current option. Both shortcuts can change a protection conclusion. The exact model and test context must travel with the number.
A third error is to ignore voltage dependence. A clearing figure at a reduced test voltage should not be accepted automatically for a higher-voltage circuit. A fourth is to compare a semiconductor's non-repetitive surge limit with a fuse value that represents a different waveform or interval. These comparisons require engineering interpretation, not a marketing chart with two unlabeled columns.
Finally, I²t does not solve mechanical fit. A fuse with apparently favorable energy data still needs the correct contact arrangement, cooling and installation instructions. The RS95 family includes multiple bolted-blade bodies; a replacement is not established by matching one rating alone.
Closing Decision
Treat I²t as a documented coordination input, not a winner-takes-all headline. Require exact fuse and semiconductor part numbers, pre-arcing and total clearing values with conditions, credible fault data and an engineer's comparison of the full protective arrangement. RITOKS can provide the semiconductor-fuse product path; the project must supply the application evidence that makes a particular fuse defensible.