Power Semiconductor Modules · Technical Explainer
How Much Dead Time Does an IGBT Inverter Actually Need?

Quick answer
An IGBT inverter needs dead time based on the selected switching devices, gate drivers, gate network and operating conditions—not a number copied from another bridge. The useful engineering deliverable is a timing budget with defined endpoints and supporting measurements. A controller setting alone does not establish the actual separation between complementary power-device conduction events.
For procurement, ask for the applicable switching data and driver delay information before accepting a claimed setting. For hardware review, establish what each interval measures and verify the relevant operating envelope. This guide explains that review without prescribing a universal duration or treating a public product-family page as an application approval.
Define the gap at the correct level
Dead time introduces a gap between complementary switching commands in a bridge leg. Its purpose is to prevent undesired simultaneous conduction of the controlled switches. Infineon's gate-driver working-principle guide distinguishes propagation delay from delay matching and explains that bridge designs must consider channel, transition and part variation. It also identifies the shoot-through risk of insufficient dead time and the conduction-loss cost of excessive dead time.
Keep command separation and actual device behavior distinct. A PWM transition is upstream of the driver output and semiconductor response. If a diagram shows only controller outputs, label it as a command diagram. Do not title that diagram “verified nonoverlap” unless the corresponding power-stage evidence supports that statement.
Dead time is a normal switching-control question. DESAT detection and fault soft shutdown address a different abnormal-condition response. Their timing records should not be substituted for a complementary PWM review, even when the same driver provides both functions.
Identify the late turn-off and early turn-on cases
The relevant comparison is not simply between two typical switching delays. A slow outgoing response and a fast incoming response can produce less actual separation than a typical-value calculation suggests. Define the outgoing turn-off endpoint and incoming turn-on endpoint according to the analysis and measurements being used.
Infineon's published community translation of KBA237369 presents maximum turn-off delay, minimum turn-on delay and driver propagation mismatch in its calculation. It warns against relying on typical datasheet values multiplied by an experience-based factor, and identifies gate resistance, collector current and driver supply as influential conditions. Its displayed margin multiplier belongs to that example; it is not a universal requirement for other modules.
Use those distinctions to request the missing limits. A datasheet value can be genuine yet insufficient for the intended budget. For example, a typical delay under one stated test condition does not become a maximum merely because it is the only number readily available. Mark the limit as unconfirmed and request relevant evidence.
Use one reference chain without double-counting
Choose a consistent reference chain before adding numbers. One approach separates controller-to-driver-output propagation from the device's subsequent switching response. Another measures the complete command-to-relevant-current response in the assembled system. Both require clear definitions; mixing them can count the same propagation twice.
If a recorded command-to-current duration already includes the driver, adding the full driver delay again inflates the budget without improving its traceability. Conversely, using a gate-to-current measurement while omitting the upstream channel difference can leave a missing interval. A reviewer should be able to mark the start and end of every contribution on a common event record.
Check both commutation directions. A result for upper-switch turn-off followed by lower-switch turn-on does not automatically establish the reverse direction. Keep the channel identities, edge directions and operating conditions attached to the measurements, especially when source and sink paths or external networks differ.
Work through an explicitly hypothetical timing example
Consider an illustrative command-to-current comparison. Assume that, within a defined hypothetical condition set, the outgoing device reaches the specified acceptable turn-off endpoint no later than 0.80 microseconds after its command. Assume the incoming device reaches its defined conduction-onset endpoint no earlier than 0.20 microseconds after its own command. These are invented teaching inputs, not RITOKS specifications or recommended settings.
Let the incoming command occur a time D after the outgoing command. The illustrative endpoints are then 0.80 microseconds and D plus 0.20 microseconds, respectively. At D equal to 0.60 microseconds, those endpoints coincide: 0.60 plus 0.20 equals 0.80. That equality leaves no additional separation in this simplified example.
If D were 0.75 microseconds, the modeled separation would be 0.75 plus 0.20 minus 0.80, or 0.15 microseconds. That arithmetic describes only the assumed endpoints. It does not validate a real bridge, assign an acceptable engineering margin or prove that all conduction mechanisms have been covered.
Because the assumed durations already start at the commands, driver propagation is included in this example's measurement scope. Adding another driver-delay term would require a different definition. Before applying any analogous calculation, establish which tolerances and conditions the underlying limits actually cover.

Record the operating-condition envelope
Build an original condition matrix rather than a single unlabeled spreadsheet row. Each record should identify the module and driver revisions, relevant gate-network configuration, supply conditions, load/current condition, temperature condition, switching direction and the evidence reference. Where the selected module's documentation provides temperature-dependent switching information, retain its stated test setup rather than extracting one curve value without context.
This matrix is a request for applicable data, not a claim that every listed variable has a quantified effect on every selected product. The responsible engineer should define which combinations require evaluation. Do not assume that separately collected extremes can be combined without reviewing their compatibility and coverage.
Keep measured limits, manufacturer limits and assumptions in separate fields. A worst observed value in a limited sample is not automatically a guaranteed production maximum. Likewise, a supplier's stated limit may cover conditions that differ from the installed circuit. The final decision needs to say what evidence supports the envelope, rather than simply labeling the largest cell “worst case.”

Do not silently discard current fall and tail behavior
The accessible KBA explanation omits rise and fall time within its stated simplified calculation. That boundary is important: a simplification justified in one explanation is not permission to ignore every part of an installed IGBT's current response. Ask whether the chosen turn-off endpoint and supporting waveform adequately cover the relevant current fall and any tail behavior under the selected conditions.
Do not automatically append a “tail time” from another measurement definition. If the outgoing command-to-current interval already ends at the applicable current criterion, part of that behavior may already be included. The task is to identify coverage, not accumulate every timing label found in a datasheet.
The same discipline applies to the incoming endpoint. State what counts as conduction onset in the analysis and how it is evidenced. A gate-voltage crossing without its definition is not a complete substitute for the power-device response. Requests for clarification should name the endpoint, channel and operating condition that are missing.
Review the implemented setting, not only the intended value
The accepted timing budget must map to what the controller and any driver interlock actually implement. Request the configured PWM behavior and the selected driver's applicable timing mode. Keep command generation, built-in delay behavior and measured device response in one traceable record; do not assume every layer independently adds the requested interval.
Record any implementation constraints relevant to the intended operating range, including the documented minimum pulse handling and timing resolution where applicable. These are questions for the selected hardware, not features guaranteed by all gate drivers. A requested setting and an implemented setting can differ, so the approval should identify the actual configuration that was reviewed.
After a driver, gate-network or control change, check whether the accepted evidence still applies. Reusing the old number can be appropriate only when the change review supports it. The previous setting is a historical record, not proof that the modified system has the same response.
Request model-specific evidence from RITOKS
The RITOKS SA100G120K6 sixpack IGBT inverter module provides a relevant three-phase module starting point. Its product identity and topology do not establish the required dead time for a proposed inverter. Request the exact order-code documentation, switching-time definitions and applicable condition data.
De dual-channel IGBT gate-driver core family is a separate drive-side sourcing reference. Ask for the selected core's propagation limits, matching definition, configured behavior and interface documentation. Neither the channel count nor a listed protection feature establishes a validated match to the sixpack module.
An effective inquiry identifies the proposed module, exact driver arrangement, gate network and operating envelope, then asks which documents support the normal-switching timing assessment. Keep fault-protection evidence in its separate record. Where public information is incomplete, request clarification without asserting that the product lacks the required capability.
Accept the evidence with a defined scope
The final review should include the event definitions, applicable limits, condition matrix, implemented setting and validation references. A qualified engineering team should evaluate real switching behavior using suitable controlled methods. This article is not a live-inverter probing procedure or an instruction to create shoot-through.
State the scope of acceptance: the specific hardware revisions, configuration and conditions covered. Unresolved entries should remain visible. This makes the result usable when a supplier proposes a substitute, a controller configuration changes or a new operating point is introduced.
Is a larger dead-time setting always better?
No. Preventing overlap is necessary, but excessive dead time also has operating consequences. Select and verify an appropriate interval for the actual design rather than maximizing the setting without an evidence review.
Can the voltage and current class determine the setting?
Not by themselves. They do not replace device response, gate-driver timing, implementation details and operating-condition evidence.
Source notes
The Infineon gate-driver guide and accessible Japanese community translation of KBA237369 were read directly. The linked original application-note PDF was not obtained and is not claimed as reviewed. The numerical illustration is original and hypothetical; no example margin or module setting is transferred to RITOKS products.