{"id":2277,"date":"2026-10-07T00:14:39","date_gmt":"2026-10-07T00:14:39","guid":{"rendered":"http:\/\/ritoks.com\/"},"modified":"2026-10-07T00:14:39","modified_gmt":"2026-10-07T00:14:39","slug":"single-vs-three-phase-energy-meters","status":"publish","type":"post","link":"https:\/\/ritoks.com\/pt-br\/single-vs-three-phase-energy-meters\/","title":{"rendered":"Medidores de energia monof\u00e1sicos x trif\u00e1sicos para trilho DIN"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A single phase vs three phase energy meter comparison begins with the circuit being measured. The first question is whether the measurement point is single-phase or three-phase, and which conductors are actually available. That decision changes the input architecture, wiring evidence and commissioning plan. A meter selected from a headline label alone can create an avoidable mismatch even when its display and rail mounting look familiar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide compares the buying questions for single-phase and three-phase DIN rail energy meters. It keeps the meter type separate from direct versus transformer-connected measurement, communications and billing requirements. Each final choice must be supported by the exact meter diagram and order code.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vis\u00e3o geral dos dados de base para a tomada de decis\u00e3o<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u00c1rea de revis\u00e3o<\/th><th>O que o comprador registra<\/th><th>Provas a serem solicitadas<\/th><\/tr><\/thead><tbody><tr><td>System at measurement point<\/td><td>Document actual phase and neutral arrangement<\/td><td>Approved single-line diagram<\/td><\/tr><tr><td>Current input<\/td><td>Identify direct connection or transformer interface<\/td><td>Exact-meter input and wiring documentation<\/td><\/tr><tr><td>Sa\u00edda<\/td><td>Define displayed and exported data<\/td><td>Register map and interface document<\/td><\/tr><tr><td>Instala\u00e7\u00e3o<\/td><td>Allow space, access and test points<\/td><td>Dimensioned drawing and commissioning plan<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure data-spectra-id=\"spectra-fac0a224-4759-47ac-906e-cb462360bcc2\" class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1400\" height=\"1050\" src=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01.webp\" alt=\"Single-Phase vs Three-Phase DIN Rail Energy Meters input diagram: supply architecture, conductors, measurement point, meter input\" class=\"wp-image-2275\" srcset=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01.webp 1400w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-300x225.webp 300w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-1024x768.webp 1024w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-768x576.webp 768w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-16x12.webp 16w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-01-600x450.webp 600w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption class=\"wp-element-caption\">Map the project inputs for DIN rail energy meters before screening candidates.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Start at the measurement point<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A site can contain both single-phase loads and a three-phase distribution system. The meter belongs to a specific measurement point, so describe the conductors and the circuit boundary there rather than naming only the upstream supply. A single-phase feeder serving one machine is a different metering problem from a three-phase feeder supplying a panel of mixed loads.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Provide a current single-line diagram, location of the meter, feeder identity, available conductors and the operational question the meter must answer. If one meter is expected to represent a group of circuits, show how those circuits enter the metering boundary.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What single-phase metering must establish<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For a single-phase application, confirm the supply arrangement and the exact terminal path through or into the meter. A product described as single-phase does not establish whether it is direct connected, transformer connected, two-wire in the expected sense or suitable for every local circuit. The terminals, input limits and installation instructions govern.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A compact meter may be convenient for branch-circuit visibility, but the panel design still needs a suitable protective and isolation arrangement, conductor space and an accessible reading or communications method. Check those items in the assembly plan.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What three-phase metering adds<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Three-phase energy measurement involves multiple voltage and current relationships. The wiring scheme must match the actual system arrangement, including whether a neutral is present and how the current inputs are obtained. A label such as three-phase is only the start of the specification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Compare the exact meter wiring diagram with the panel single-line drawing. Mark each phase, current path and reference connection, and have the design team confirm that the selected scheme measures the intended feeder rather than a convenient subset of conductors.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Separate phase count from current interface<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Phase count and current input method are separate decisions. A meter can have a direct-connected path or use external current transformers, depending on its design. The presence of a CT elsewhere in the panel does not prove the proposed meter accepts its secondary output or ratio setting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If transformers are required, record their ratio, output, accuracy and burden evidence with the meter input specification. For a direct-connected option, review conductor routing, terminals and the specific permitted connection. Do not infer one interface from a neighboring model.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Define the data the project actually needs<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Some projects need only a local energy reading. Others need interval data, alarms, pulse outputs or a network connection to a building or industrial system. These are independent requirements that may change the order code or wiring.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">State the required measurements, update expectations, communication medium, register documentation and integration owner. A meter with a port is not automatically a working monitoring system: the receiving software must interpret the correct data and the commissioning team must verify the mapping.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Compare offers using one measurement brief<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ask each supplier to respond to the same measurement point, wiring architecture and data requirement. An offer for a single-phase branch meter is not equivalent to a three-phase feeder meter, even when both quote energy measurement. Likewise, a meter that needs external CTs is not a direct substitute for one designed for direct connection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Record the complete meter code, accessories, transformer requirements, communications option and documents supplied. Keep differences visible instead of normalizing every quotation to a generic energy-meter line item.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Commission the actual installation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">At commissioning, verify the connection against the approved diagram and check the sign and plausibility of measured values under known operating states. Compare the meter reading with the intended circuit boundary, not just with a powered display.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where data is exported, confirm addressing, register interpretation, scaling and the destination system. Capture the configured parameters and as-built wiring so a replacement can be reviewed against the same evidence later.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Criar um arquivo de evid\u00eancias com modelo exato<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A category or product-family page helps locate relevant options; it does not by itself approve one variant. For DIN rail energy meters, keep the full proposed order code, current datasheet, terminal or mounting drawing, operating instructions and any project calculation together. Read the conditions attached to each rating or function. If the evidence belongs to a neighboring model, request the correct document instead of carrying the claim across.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A equipe do projeto \u00e9 respons\u00e1vel pelos dados de entrada do sistema e pelos crit\u00e9rios de aceita\u00e7\u00e3o. O fornecedor \u00e9 respons\u00e1vel pelas evid\u00eancias relativas ao item oferecido. Na revis\u00e3o t\u00e9cnica, associe cada requisito obrigat\u00f3rio ao documento e \u00e0 revis\u00e3o exatos que o atendem. Marque um campo ausente como \u201cem aberto\u201d, \u201ccondicional\u201d ou \u201cn\u00e3o suportado\u201d. Isso gera uma decis\u00e3o rastre\u00e1vel e evita que um valor nominal favor\u00e1vel oculte uma conex\u00e3o ou condi\u00e7\u00e3o de instala\u00e7\u00e3o incompat\u00edvel.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Compare as ofertas completas<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Item<\/th><th>Registro na compara\u00e7\u00e3o<\/th><th>Motivo<\/th><\/tr><\/thead><tbody><tr><td>Item dispon\u00edvel para encomenda<\/td><td>C\u00f3digo completo, variantes e acess\u00f3rios inclu\u00eddos<\/td><td>Evita suposi\u00e7\u00f5es em n\u00edvel familiar<\/td><\/tr><tr><td>Correspond\u00eancia de aplicativos<\/td><td>Resposta por escrito a cada contribui\u00e7\u00e3o do projeto<\/td><td>Mant\u00e9m as exce\u00e7\u00f5es vis\u00edveis<\/td><\/tr><tr><td>Documenta\u00e7\u00e3o<\/td><td>Ficha t\u00e9cnica, desenho, instru\u00e7\u00f5es e revis\u00f5es<\/td><td>Links relacionados ao item oferecido<\/td><\/tr><tr><td>Quest\u00f5es pendentes<\/td><td>Respons\u00e1vel e prazo para esclarecimento<\/td><td>Evita a aceita\u00e7\u00e3o passiva<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure data-spectra-id=\"spectra-c0c80806-1443-47c8-abc6-460d53c285fa\" class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1400\" height=\"1050\" src=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02.webp\" alt=\"Single-Phase vs Three-Phase DIN Rail Energy Meters evidence diagram: wiring diagram, ct requirement, data output, commissioning\" class=\"wp-image-2276\" srcset=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02.webp 1400w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-300x225.webp 300w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-1024x768.webp 1024w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-768x576.webp 768w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-16x12.webp 16w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-body-02-600x450.webp 600w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption class=\"wp-element-caption\">Compare DIN rail energy meters offers using exact-model evidence and open questions.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Utilize o mesmo briefing do projeto para todos os or\u00e7amentos. Condi\u00e7\u00f5es comerciais, como pre\u00e7o e prazo de entrega, podem ser comparadas assim que o escopo t\u00e9cnico for padronizado. N\u00e3o considere acess\u00f3rios omitidos, classifica\u00e7\u00f5es n\u00e3o comprovadas ou uma suposi\u00e7\u00e3o de fia\u00e7\u00e3o n\u00e3o esclarecida como equivalentes a uma proposta documentada. Se for proposta uma alternativa, pergunte quais par\u00e2metros se alteram e repita a an\u00e1lise dos itens afetados.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Revis\u00e3o da instala\u00e7\u00e3o e aceita\u00e7\u00e3o<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes da instala\u00e7\u00e3o, verifique se a etiqueta fornecida, o c\u00f3digo completo e os acess\u00f3rios correspondem ao registro aprovado. Compare os terminais, a montagem, o acesso aos condutores e qualquer orienta\u00e7\u00e3o indicada com as instru\u00e7\u00f5es exatas. Um produto que pare\u00e7a fisicamente semelhante \u00e0 vers\u00e3o aprovada pode, ainda assim, apresentar uma configura\u00e7\u00e3o el\u00e9trica, op\u00e7\u00e3o de controle ou crit\u00e9rios de teste diferentes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Plan an as-built check that addresses the project&#8217;s real risks. This may involve wiring against the approved diagram, functional response, measurements under representative operating states and confirmation of any communication or alarm feature. Record the conditions and results. The acceptance plan should come from the application and supplier evidence, not from a generic article checklist.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Lista de verifica\u00e7\u00e3o para solicita\u00e7\u00e3o de cota\u00e7\u00e3o<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Identify the circuit, equipment and location that DIN rail energy meters must serve.<\/li><li>Anexe o desenho do sistema e os estados operacionais que definem a aplica\u00e7\u00e3o.<\/li><li>Record supply architecture and its source document.<\/li><li>Registrar os condutores e seu documento de origem.<\/li><li>Record measurement point and its source document.<\/li><li>Record meter input and its source document.<\/li><li>Confirm the exact-model evidence for wiring diagram.<\/li><li>Confirm the exact-model evidence for ct requirement.<\/li><li>Confirm the exact-model evidence for data output.<\/li><li>Confirm the exact-model evidence for commissioning.<\/li><li>Solicite o c\u00f3digo completo do pedido, os acess\u00f3rios, os desenhos e a vers\u00e3o atualizada da ficha t\u00e9cnica.<\/li><li>Pergunte sobre exclus\u00f5es, premissas, substitutos e quest\u00f5es de engenharia ainda n\u00e3o resolvidas.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A solicita\u00e7\u00e3o de cota\u00e7\u00e3o deve ser suficientemente espec\u00edfica para que um fornecedor possa respond\u00ea-la sem precisar inventar valores ausentes do projeto. Se um dado essencial ainda n\u00e3o for conhecido, indique-o como uma pergunta e identifique quem ir\u00e1 determin\u00e1-lo. N\u00e3o transforme uma suposi\u00e7\u00e3o em uma classifica\u00e7\u00e3o, uma declara\u00e7\u00e3o de conformidade ou um m\u00e9todo de instala\u00e7\u00e3o aprovado.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">O que influencia a decis\u00e3o<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A decision can change when the source arrangement, load behavior, environment, installation geometry or required function changes. Revisit the selected DIN rail energy meters whenever one of those inputs moves outside the approved brief. Recheck the order code and the exact evidence affected by the change; do not rely on a previous approval for a circuit that now asks the component to do different work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mantenha um breve hist\u00f3rico de revis\u00f5es do briefing do projeto, da resposta do fornecedor e da lista de exce\u00e7\u00f5es aceitas. Esse registro ajuda as equipes de engenharia, compras e comissionamento a trabalharem com a mesma vers\u00e3o. \u00c9 especialmente \u00fatil quando uma cota\u00e7\u00e3o \u00e9 revisada, \u00e9 oferecido um substituto ou o projeto do painel sofre altera\u00e7\u00f5es ap\u00f3s a primeira compara\u00e7\u00e3o.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Can a three-phase meter replace a single-phase meter?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Only if the exact model documentation permits the intended single-phase wiring and the project accepts that configuration. Do not infer compatibility from the broader family name.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Does a meter with RS485 always support the required platform?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Obtain the exact protocol and register documentation, then test the intended points in the receiving system.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Are direct-connected and CT-operated meters interchangeable?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Their input arrangements and installation evidence differ. Match the meter and any CTs as one measured system.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">P\u00e1ginas relevantes do RITOKS<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Para obter informa\u00e7\u00f5es sobre a fam\u00edlia de produtos, consulte <a href=\"https:\/\/ritoks.com\/pt-br\/product-category\/electrical-measurement-monitoring\/din-rail-energy-meters\/\">Medi\u00e7\u00e3o e monitoramento el\u00e9tricos<\/a>. As p\u00e1ginas de produtos publicadas relacionadas incluem <a href=\"https:\/\/ritoks.com\/pt-br\/products\/dds1108-single-phase-din-rail-energy-meter\/\">Dds1108 Single Phase Din Rail Energy Meter<\/a>, <a href=\"https:\/\/ritoks.com\/pt-br\/products\/dts5158b-three-phase-four-wire-din-rail-energy-meter\/\">Dts5158b Three Phase Four Wire Din Rail Energy Meter<\/a>, <a href=\"https:\/\/ritoks.com\/pt-br\/products\/2p-single-phase-rs485-modbus-din-rail-energy-meter\/\">2p Single Phase Rs485 Modbus Din Rail Energy Meter<\/a>. Utilize os documentos atuais referentes ao modelo exato ao comparar um item proposto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para obter um or\u00e7amento espec\u00edfico para sua aplica\u00e7\u00e3o, <a href=\"https:\/\/ritoks.com\/pt-br\/contact-us\/\">enviar o briefing do projeto para a RITOKS<\/a> com os diagramas e as quest\u00f5es em aberto acima.<\/p>","protected":false},"excerpt":{"rendered":"<p>Single-Phase vs Three-Phase DIN Rail Energy Meters. Review application inputs, exact-model documents and RFQ questions before selecting DIN rail energy meters.<\/p>","protected":false},"author":1,"featured_media":2274,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ritoks_resource_detail_renderer":"viox","ritoks_resource_product_cat_term_id":128,"footnotes":""},"categories":[68],"tags":[],"class_list":["post-2277","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-measurement-monitoring"],"acf":[],"spectra_blocks_featured_image_url":{"thumbnail":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01-150x150.webp","width":150,"height":150},"medium":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01-300x169.webp","width":300,"height":169},"medium_large":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01-768x432.webp","width":768,"height":432},"large":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01-1024x576.webp","width":1024,"height":576},"full":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/single-vs-three-phase-energy-meters-hero-01.webp","width":1600,"height":900}},"spectra_blocks_author_info":{"display_name":"RITOKS","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/6d7d0fc73468198f994ab13ef6eb6558c53b6ed1ad86364d5165efe8bdf8eb4a?s=96&d=mm&r=g","author_link":"https:\/\/ritoks.com\/pt-br\/author\/dazzlingwqbgmail-com\/","description":""},"_links":{"self":[{"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/posts\/2277","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/comments?post=2277"}],"version-history":[{"count":1,"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/posts\/2277\/revisions"}],"predecessor-version":[{"id":2278,"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/posts\/2277\/revisions\/2278"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/media\/2274"}],"wp:attachment":[{"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/media?parent=2277"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/categories?post=2277"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ritoks.com\/pt-br\/wp-json\/wp\/v2\/tags?post=2277"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}