{"id":2252,"date":"2026-10-06T06:17:53","date_gmt":"2026-10-06T06:17:53","guid":{"rendered":"http:\/\/ritoks.com\/"},"modified":"2026-10-06T06:17:53","modified_gmt":"2026-10-06T06:17:53","slug":"current-transformer-accuracy-class-burden","status":"publish","type":"post","link":"https:\/\/ritoks.com\/ro\/current-transformer-accuracy-class-burden\/","title":{"rendered":"Current Transformer Accuracy Class and Burden: Verification Guide"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Current transformer accuracy class and burden describe a measurement system, not a standalone quality score. A CT specified for a particular class is assessed under defined conditions. The connected meter, cable and terminals impose a real secondary burden that must fit the evidence for the exact CT.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide explains the questions a buyer should put in the technical file. It does not assign universal accuracy to a CT family or prescribe a ratio from the equipment name alone.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Prezentare general\u0103 a datelor de intrare pentru luarea deciziilor<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Zona de evaluare<\/th><th>Ce \u00eenregistreaz\u0103 cump\u0103r\u0103torul<\/th><th>Documente care trebuie solicitate<\/th><\/tr><\/thead><tbody><tr><td>Primary side<\/td><td>Expected current range and conductor arrangement<\/td><td>Load record and installation drawing<\/td><\/tr><tr><td>Secondary side<\/td><td>Output expected by receiving device<\/td><td>CT and meter input documents<\/td><\/tr><tr><td>Povar\u0103<\/td><td>Meter input plus lead and connection contribution<\/td><td>Circuit estimate and exact CT data<\/td><\/tr><tr><td>Precizie<\/td><td>Required class under relevant conditions<\/td><td>Exact CT datasheet and test basis<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure data-spectra-id=\"spectra-5dd4553e-cf0c-424d-a5ae-985937a3b284\" class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1400\" height=\"1050\" src=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-01.webp\" alt=\"Current Transformer Accuracy Class and Burden: Verification Guide input diagram: primary range, secondary output, accuracy class, rated burden\" class=\"wp-image-2250\" srcset=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-01.webp 1400w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-01-300x225.webp 300w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-01-1024x768.webp 1024w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-01-768x576.webp 768w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-01-16x12.webp 16w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-01-600x450.webp 600w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption class=\"wp-element-caption\">Map the project inputs for current transformers before screening candidates.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Define the measurement purpose<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A monitoring display, energy accounting function and control input may demand different evidence. State what the reading will be used for, its relevant operating range and the consequences of error. The CT ratio and class should follow that purpose.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the circuit rarely operates near its nominal maximum, consider performance over the actual range rather than selecting from one full-scale number. Ask the supplier for the exact conditions to which its accuracy statement applies.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Understand class as a conditional statement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An accuracy class describes performance under a defined standard or test basis. It is not a promise that the installed meter will show that error under every current, frequency, temperature or burden.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Read the complete CT datasheet, including the specified output, rated burden and class conditions. Do not transfer a class label from one variant, core size or ratio to another.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Calculate the complete secondary burden<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The receiving meter input is only part of the load seen by the CT secondary. Lead resistance, terminals and other connected devices can contribute. Longer runs and multiple instruments may materially change the burden.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Document the secondary route and the actual devices attached to it. Compare the resulting burden with the exact CT evidence; if the circuit changes, update the assessment. Avoid treating a catalog burden value as a measurement of the installed circuit.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Match ratio and output to the meter<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The CT primary ratio should represent the expected current range, while the secondary output must match the meter input. A number in the product title does not prove the output of every order code or compatibility with every panel meter.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Obtain both connection diagrams and the meter configuration method. Record any programmable ratio in the commissioning file so the display and exported data use the same scaling.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Check physical installation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Solid-core and split-core devices may solve different installation constraints. Confirm conductor or busbar dimensions, window space, mounting access and orientation. The choice of housing also affects how the secondary circuit can be routed and inspected.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If retrofitting a live panel is proposed, the work method needs a separate safety review by qualified personnel. Do not infer installation permission from the split-core label.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Verify the system, not only the CT<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A CT, meter, wiring path and configured ratio form one measurement chain. Commissioning should check polarity or direction where relevant, expected response and scaling under known conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Keep the as-built secondary diagram and configuration alongside the selected CT order code. This makes it possible to diagnose a discrepancy between the meter display and another measurement without guessing which component changed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Request evidence that matches the quoted item<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ask for exact ratio, output, rated burden, accuracy basis, physical drawing and installation instructions for the proposed CT. Separate what the product page shows from what the order-specific documents prove.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A proposal remains open if the accuracy class is visible but the burden or operating conditions are not. Resolve those fields before approval, especially when the reading supports a commercial or control decision.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Crearea unui dosar de probe bazat pe un model exact<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A category or product-family page helps locate relevant options; it does not by itself approve one variant. For current transformers, keep the full proposed order code, current datasheet, terminal or mounting drawing, operating instructions and any project calculation together. Read the conditions attached to each rating or function. If the evidence belongs to a neighboring model, request the correct document instead of carrying the claim across.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Echipa de proiect este responsabil\u0103 de datele de intrare ale sistemului \u0219i de criteriile de acceptare. Furnizorul este responsabil de dovezile referitoare la elementul oferit. \u00cen cadrul revizuirii tehnice, asocia\u021bi fiecare cerin\u021b\u0103 obligatorie cu documentul \u0219i versiunea exact\u0103 care r\u0103spund acesteia. Marca\u021bi un c\u00e2mp lips\u0103 ca fiind deschis, condi\u021bionat sau neacceptat. Astfel se creeaz\u0103 o decizie trasabil\u0103 \u0219i se evit\u0103 ca o valoare nominal\u0103 favorabil\u0103 s\u0103 ascund\u0103 o conexiune sau o condi\u021bie de instalare incompatibil\u0103.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Compar\u0103 ofertele complete<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Articol<\/th><th>\u00cenregistrare \u00een compara\u021bie<\/th><th>Motiv<\/th><\/tr><\/thead><tbody><tr><td>Articol disponibil pentru comand\u0103<\/td><td>Cod complet, variant\u0103 \u0219i accesorii incluse<\/td><td>Previne presupunerile la nivel de familie<\/td><\/tr><tr><td>Potrivire \u00eentre aplica\u021bii<\/td><td>R\u0103spuns scris la fiecare contribu\u021bie la proiect<\/td><td>Men\u021bine excep\u021biile vizibile<\/td><\/tr><tr><td>Documenta\u021bie<\/td><td>Fi\u0219\u0103 tehnic\u0103, schi\u021b\u0103, instruc\u021biuni \u0219i revizuiri<\/td><td>Leg\u0103turi cu privire la articolul oferit<\/td><\/tr><tr><td>Aspecte nerezolvate<\/td><td>Proprietar \u0219i termenul limit\u0103 pentru clarific\u0103ri<\/td><td>Evit\u0103 acceptarea tacit\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure data-spectra-id=\"spectra-f7470056-08be-45b7-a4a9-fb48ff5c681b\" class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1400\" height=\"1050\" src=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-02.webp\" alt=\"Current Transformer Accuracy Class and Burden: Verification Guide evidence diagram: meter input, lead length, connection, test record\" class=\"wp-image-2251\" srcset=\"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-02.webp 1400w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-02-300x225.webp 300w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-02-1024x768.webp 1024w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-02-768x576.webp 768w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-02-16x12.webp 16w, https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-body-02-600x450.webp 600w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption class=\"wp-element-caption\">Compare current transformers offers using exact-model evidence and open questions.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Folosi\u021bi acela\u0219i caiet de sarcini pentru fiecare ofert\u0103. Condi\u021biile comerciale, precum pre\u021bul \u0219i termenul de livrare, pot fi comparate odat\u0103 ce domeniul de aplicare tehnic este standardizat. Nu considera\u021bi accesoriile omise, valorile nominale nejustificate sau o ipotez\u0103 privind cablarea nerezolvat\u0103 ca fiind echivalente cu o ofert\u0103 documentat\u0103. Dac\u0103 se propune o alternativ\u0103, \u00eentreba\u021bi care sunt elementele care se modific\u0103 \u0219i repeta\u021bi analiza pentru elementele afectate.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Verificarea instal\u0103rii \u0219i a recep\u021biei<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cenainte de instalare, verifica\u021bi dac\u0103 eticheta livrat\u0103, codul complet \u0219i accesoriile corespund cu \u00eenregistrarea aprobat\u0103. Compara\u021bi bornele, sistemul de montare, accesul la conductoare \u0219i orice orientare specificat\u0103 cu instruc\u021biunile exacte. Un produs care pare similar din punct de vedere fizic cu versiunea aprobat\u0103 poate avea totu\u0219i o configura\u021bie electric\u0103, o op\u021biune de control sau o baz\u0103 de testare diferit\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Plan an as-built check that addresses the project&#8217;s real risks. This may involve wiring against the approved diagram, functional response, measurements under representative operating states and confirmation of any communication or alarm feature. Record the conditions and results. The acceptance plan should come from the application and supplier evidence, not from a generic article checklist.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Lista de verificare pentru cererea de ofert\u0103<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Identify the circuit, equipment and location that current transformers must serve.<\/li><li>Ata\u0219a\u021bi schi\u021ba sistemului \u0219i st\u0103rile de func\u021bionare care definesc aplica\u021bia.<\/li><li>Record primary range and its source document.<\/li><li>Record secondary output and its source document.<\/li><li>Record accuracy class and its source document.<\/li><li>Record rated burden and its source document.<\/li><li>Confirm the exact-model evidence for meter input.<\/li><li>Confirm the exact-model evidence for lead length.<\/li><li>Confirm the exact-model evidence for connection.<\/li><li>Confirm the exact-model evidence for test record.<\/li><li>Solicita\u021bi codul complet al comenzii, accesoriile, desenele tehnice \u0219i versiunea actualizat\u0103 a fi\u0219ei tehnice.<\/li><li>\u00centreba\u021bi despre excep\u021bii, ipoteze, alternative \u0219i aspecte tehnice nerezolvate.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Cererea de ofert\u0103 trebuie s\u0103 fie suficient de detaliat\u0103 pentru ca un furnizor s\u0103 poat\u0103 r\u0103spunde f\u0103r\u0103 a inventa valori lips\u0103 din proiect. Dac\u0103 o informa\u021bie esen\u021bial\u0103 nu este \u00eenc\u0103 cunoscut\u0103, marca\u021bi-o ca \u00eentrebare \u0219i preciza\u021bi cine o va stabili. Nu transforma\u021bi o ipotez\u0103 \u00eentr-o evaluare, o declara\u021bie de conformitate sau o metod\u0103 de instalare aprobat\u0103.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ce influen\u021beaz\u0103 decizia<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A decision can change when the source arrangement, load behavior, environment, installation geometry or required function changes. Revisit the selected current transformers whenever one of those inputs moves outside the approved brief. Recheck the order code and the exact evidence affected by the change; do not rely on a previous approval for a circuit that now asks the component to do different work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">P\u0103stra\u021bi un istoric succint al reviziilor pentru caietul de sarcini al proiectului, r\u0103spunsul furnizorului \u0219i lista excep\u021biilor acceptate. Acest istoric ajut\u0103 departamentele de inginerie, achizi\u021bii \u0219i punere \u00een func\u021biune s\u0103 lucreze pe baza aceleia\u0219i versiuni. Este deosebit de util atunci c\u00e2nd o ofert\u0103 este revizuit\u0103, se propune un produs \u00eenlocuitor sau proiectul panoului se modific\u0103 dup\u0103 prima compara\u021bie.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Aspecte care trebuie clarificate \u00eenainte de aprobare<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ask who owns each remaining technical question for the proposed current transformers. The buyer should confirm the system inputs and installation constraints; the supplier should confirm the exact item, included options and applicable documentation. Put the answer and document revision beside the question. An unanswered point should remain visible in the comparison rather than being converted into an assumed feature.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Atunci c\u00e2nd o ofert\u0103 prezint\u0103 o alternativ\u0103, solicita\u021bi o explica\u021bie scris\u0103 privind modific\u0103rile aduse circuitului, modului de montare sau parametrilor de performan\u021b\u0103. Analiza\u021bi orice schi\u021b\u0103 nou\u0103 \u00eempreun\u0103 cu inginerul de proiect \u0219i consemna\u021bi dac\u0103 modificarea propus\u0103 este acceptabil\u0103. O substituire reprezint\u0103 o nou\u0103 decizie tehnic\u0103, chiar dac\u0103 pare echivalent\u0103 din punct de vedere comercial. Acest aspect este deosebit de important atunci c\u00e2nd mai mul\u021bi furnizori utilizeaz\u0103 denumiri similare pentru familii de produse cu configura\u021bii diferite.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Does a higher accuracy class guarantee an accurate installation?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. The connected burden, current range, meter input, wiring and configuration also matter.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can I connect any CT to any panel meter?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Verify secondary output, input requirements, ratio configuration and wiring.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is rated burden the same as actual burden?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Rated burden is a product condition; actual burden is created by the installed secondary circuit.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Pagini relevante ale RITOKS<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pentru informa\u021bii privind familia de produse, consulta\u021bi <a href=\"https:\/\/ritoks.com\/ro\/product-category\/electrical-measurement-monitoring\/current-transformers\/\">M\u0103surarea \u0219i monitorizarea sistemelor electrice<\/a>. Paginile de produs publicate pe aceast\u0103 tem\u0103 includ <a href=\"https:\/\/ritoks.com\/ro\/products\/bh-0-66-60i-current-transformer-200-5a-1500-5a\/\">Bh 0 66 60i Current Transformer 200 5a 1500 5a<\/a>, <a href=\"https:\/\/ritoks.com\/ro\/products\/dp-series-split-core-current-transformer\/\">Dp Series Split Core Current Transformer<\/a>, <a href=\"https:\/\/ritoks.com\/ro\/products\/gta20l-precision-current-transformer-10a-100a\/\">Gta20l Precision Current Transformer 10a 100a<\/a>. Folosi\u021bi documentele lor actuale referitoare la modelul exact atunci c\u00e2nd compara\u021bi un articol propus.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pentru o ofert\u0103 de pre\u021b adaptat\u0103 aplica\u021biei dumneavoastr\u0103, <a href=\"https:\/\/ritoks.com\/ro\/contact-us\/\">trimite\u021bi caietul de sarcini al proiectului c\u0103tre RITOKS<\/a> \u00eempreun\u0103 cu diagramele \u0219i \u00eentreb\u0103rile deschise de mai sus.<\/p>","protected":false},"excerpt":{"rendered":"<p>Current Transformer Accuracy Class and Burden: Verification Guide. Review application inputs, exact-model documents and RFQ questions before selecting current transformers.<\/p>","protected":false},"author":1,"featured_media":2249,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ritoks_resource_detail_renderer":"viox","ritoks_resource_product_cat_term_id":120,"footnotes":""},"categories":[68],"tags":[],"class_list":["post-2252","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-measurement-monitoring"],"acf":[],"spectra_blocks_featured_image_url":{"thumbnail":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-hero-01-150x150.webp","width":150,"height":150},"medium":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-hero-01-300x169.webp","width":300,"height":169},"medium_large":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-hero-01-768x432.webp","width":768,"height":432},"large":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-hero-01-1024x576.webp","width":1024,"height":576},"full":{"url":"https:\/\/ritoks.com\/wp-content\/uploads\/2026\/10\/current-transformer-accuracy-class-burden-hero-01.webp","width":1600,"height":900}},"spectra_blocks_author_info":{"display_name":"RITOKS","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/6d7d0fc73468198f994ab13ef6eb6558c53b6ed1ad86364d5165efe8bdf8eb4a?s=96&d=mm&r=g","author_link":"https:\/\/ritoks.com\/ro\/author\/dazzlingwqbgmail-com\/","description":""},"_links":{"self":[{"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/posts\/2252","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/comments?post=2252"}],"version-history":[{"count":1,"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/posts\/2252\/revisions"}],"predecessor-version":[{"id":2253,"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/posts\/2252\/revisions\/2253"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/media\/2249"}],"wp:attachment":[{"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/media?parent=2252"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/categories?post=2252"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ritoks.com\/ro\/wp-json\/wp\/v2\/tags?post=2252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}