RCD Selectivity: Checking Delay, Sensitivity and Coordination Data

Watercolor conceptual illustration of two closed distribution cabinets in a sunlit equipment room.

Quick answer

A larger residual-current sensitivity value upstream does not, by itself, prove RCD selectivity. Review the exact upstream and downstream devices together, including their residual-current characteristics, applicable timing information and manufacturer coordination conditions. Keep that pairing review separate from the rated load current printed on each device.

The purchasing objective is a documented answer to a specific question: for the stated distribution arrangement and conditions, which protective device is intended to disconnect, and what evidence supports that discrimination? A generic sensitivity ratio, a product-family option list or a drawing showing devices in series does not complete the answer. The designer must also preserve the required protection duties; delaying an upstream device is not a universal solution that can be selected independently of the installation's protection requirements.

This article explains how to assess the evidence package. It does not prescribe trip settings, installation changes or test procedures.

Establish which fault and which disconnection scope are being reviewed

Write down the intended boundary before comparing catalogues. A review concerning one downstream final circuit is different from a claim that every protective level in a complete distribution system is selective. Specify the upstream and downstream references, the relevant circuit group, and the intended extent of disconnection.

The boundary prevents an apparently successful comparison from being generalized. A manufacturer table may address a particular pair under stated conditions. That entry does not automatically cover another upstream device, an intermediate protective level or a replacement downstream reference. Keep the pairing and its evidence together when the design is revised.

Describe the operating consequence in useful project terms. For example, a hypothetical design brief might seek to disconnect a faulted branch while retaining unrelated branches. That is an objective, not a demonstrated result. The review must still establish which devices provide the relevant functions and what coordination evidence applies.

Avoid an undefined claim such as “full selectivity throughout.” It gives procurement no bounded acceptance question and can conceal differences between residual-current protection and overcurrent protection. Ask the responsible designer to identify the protection function covered by each piece of evidence rather than allowing the same label to stand for every fault condition.

Keep load current, residual sensitivity and timing distinct

An ampere rating for the device's load path and a rated residual operating current describe different quantities. A quotation that supplies only the load-current rating leaves the residual coordination question unanswered. Similarly, a listed range of residual sensitivities establishes available configurations rather than the timing behavior of the ordered unit.

The documents should identify the selected residual-current characteristic and its applicable conditions. This is especially relevant when several variants share a catalogue photograph or abbreviated family name. A procurement line that omits the variant may be adequate for an early budget inquiry but insufficient for a final pairing review.

Timing adds a separate dimension. Information showing the upstream device's minimum non-tripping behavior and the downstream device's maximum operating behavior is useful only when the relevant conditions and references match. A single nominal operating time detached from its current conditions should not be treated as the complete response characteristic.

Likewise, a short-time disturbance-resistant feature should not be renamed a proven selective characteristic simply because both descriptions involve time. Use the manufacturer's exact terms and applicable pairing evidence. The review should preserve what the selected document actually establishes, not translate a marketing phrase into a different protection claim.

Separate load-current, residual-sensitivity and timing symbols show three different review quantities.
Load rating, residual sensitivity and timing are different review quantities.

Read general guidance as a starting framework

Schneider Electric's Electrical Installation Guide combines sensitivity separation with suitable upstream delay. Its general guidance uses an upstream sensitivity at least three times the downstream value, while also requiring the upstream minimum non-tripping time to exceed downstream maximum tripping time. The same page describes named VigiPacT and MicroLogic Vigi combinations with lower ratios, dependent on actual products. Those examples demonstrate why a ratio alone is not a universal pairing approval. Coordination guide.

For a buyer, the practical question is not which published ratio sounds most favorable. It is whether the supplier can identify the applicable document for the proposed equipment. A manufacturer-specific exception cannot be transferred to a visually similar device or to another supplier's family without the necessary evidence.

Retain the relationship between conditions when summarizing guidance internally. A spreadsheet cell containing only “three times” loses the delay condition. A later reviewer might mistakenly treat that cell as a complete rule. A better entry links to the applicable section and states that sensitivity and timing are being assessed together.

Use a pairing register that exposes missing comparisons

The following register is an editorial review aid rather than a standard-mandated test form. Complete it with the exact selected references, not generic placeholders such as “RCD upstream.”

Field What belongs in the record What an omission prevents
Device identity Upstream and downstream order references and revisions Establishing that the documents concern the purchased pair
Function and characteristic Selected residual-current type and sensitivity Comparing the intended protection functions
Timing evidence Applicable curves or stated operating boundaries Reviewing response separation under the relevant conditions
Pairing evidence Manufacturer table or specific application statement Claiming support for the actual combination
Application boundary Distribution level, applicable conditions and intended scope Extending the result to another circuit arrangement
Technical decision Responsible designer's acceptance and unresolved items Distinguishing an inquiry from an approved design

Use the final column to make the review actionable. “Timing evidence missing” is more useful than a generic failure mark because it identifies what must change before a conclusion can be reached. Where the supplier provides a pairing table, capture its revision and the particular entry instead of saving an unlabelled screenshot.

A register should also show whether an entry is a supplier statement, a manufacturer application document or an inference by the project team. These categories can coexist without being equivalent. The distinction makes it easier to resolve disagreements about what was actually promised.

Two document-review rows contrast matching device pairs and conditions with unresolved mismatches.
Match both the device pair and application conditions before interpreting a coordination statement.

A worked comparison of incomplete and usable inquiries

Consider a hypothetical inquiry that asks for an upstream device with a higher mA value than the downstream unit and describes the result as selective. It includes both load-current ratings but no timing documents. That request has identified candidate equipment, yet it has not shown coordination. The missing timing and pairing evidence remains a specific technical question.

A revised inquiry retains the same candidate references but asks whether the manufacturer documents the intended upstream/downstream pairing for the stated circuit scope. It requests the applicable timing information and any conditions attached to the pairing statement. The revision does not assume that the devices pass; it creates a question the supplier can answer with evidence.

Suppose the returned table covers a different downstream reference. Do not silently use the nearby entry. Record the mismatch and request the correct pairing or a designer-approved alternative. The important change is the equipment identity, even if the two devices share the same nominal load current and catalogue family.

Now suppose the pair is listed, but only for an application condition different from the project. That is a condition mismatch rather than an identity mismatch. Treating the two separately avoids unnecessary catalogue research and points the supplier toward the actual unresolved issue.

Compare timing documents on the same basis

Before interpreting the spacing between curves, confirm the quantity on each axis, the unit, and the device or setting represented by each boundary. A graph with unclear legends cannot establish which line describes the selected unit. Keep the source document and its revision attached to the comparison.

Separate minimum, maximum and nominal descriptions. A nominal value describes a different evidential boundary from a worst-case operating limit. Substituting one for another can make a comparison look more definite than the documents support. Where the source supplies a band rather than a line, retain that range in the designer's review.

Also check the scope of the evidence. A short-circuit selectivity table concerns a different protection question from residual-current coordination unless the document explicitly addresses both. A complete procurement file may therefore need separate answers for separate functions. One successful check should not be made to carry the entire protection claim.

If the documents cannot be compared directly, identify the specific incompatibility: different devices, different quantities, different conditions or incomplete timing definitions. That diagnosis is more productive than requesting more curves without saying what information is missing.

Revisions can change a previously clear pairing

A component substitution should trigger review of the affected pairing. Reusing the old coordination statement merely because the replacement has a familiar sensitivity option overlooks the exact reference and characteristic that supported the earlier decision. Preserve the approved equipment identity in the technical file so a purchasing change is visible.

The same discipline applies when a distributor supplies an alternative regional reference or an updated series. The right question is whether the current manufacturer's evidence covers that offered reference under the project conditions. A general assertion that the new product is “equivalent” should be connected to the specific coordination duty being claimed.

Changes elsewhere in the distribution arrangement can also alter the review boundary. If an intermediate protection level is introduced, a previously documented pair does not automatically establish the new three-device arrangement. Update the pairing register where the evidence changes, while preserving the original record as the basis of the earlier design.

Request a documented pairing rather than a preferred ratio

RITOKS lists an RTX-RCA63 Type A RCCB family. A family listing is a starting point for identifying the ordered configuration; it is not a declaration that the selected unit has a time-delayed characteristic or is coordinated with a particular downstream device.

Send the exact upstream/downstream references, intended residual-current functions, relevant distribution boundary and required supporting documents with the inquiry. Ask the responsible supplier to distinguish what is established by the selected device documentation from what needs application review. The final decision belongs with the qualified designer evaluating the complete protection requirements, not with an isolated ratio copied into a purchasing note.

Evaluate the scope of a supplier answer

Supplier responses can address different levels of the question. A catalogue response identifies available products. A device-document response explains the characteristics of a selected reference. A pairing response addresses the actual upstream and downstream combination under stated conditions. Classify the answer received before treating it as the answer requested.

For example, a hypothetical buyer asks whether pair U and D provides the intended discrimination for distribution group G. The supplier sends a data sheet for U. That document may be complete and accurate, yet it has not answered the pairing question. The efficient follow-up is to retain the useful device sheet and request the missing combination evidence, rather than restart product selection from the beginning.

If the supplier instead returns a pairing statement covering U and D but a different application boundary, identify that specific difference. The response is more advanced than a product brochure, but its conclusion still belongs to its stated scope. This distinction helps purchasing teams compare offers fairly: a detailed technical attachment is valuable only to the extent that it answers the actual project question. A shorter response tied to the correct pair can be more useful than a large unrelated catalogue.

Source notes