
Electrical Measurement & Monitoring · RTX-MGW4
RTX-MGW4 Modbus RTU-TCP ゲートウェイ
DIN-rail gateways connect supported Modbus RTU equipment to a Modbus TCP network. This candidate is scoped to the RTU-to-TCP variant, not the separately offered BACnet version.
ModbusRTU → TCP
4RS485 interfaces
12–24 V DC供給
DINレール取り付け
製品概要
DIN-rail gateways connect supported Modbus RTU equipment to a Modbus TCP network. This candidate is scoped to the RTU-to-TCP variant, not the separately offered BACnet version. Port counts do not establish throughput or device capacity. BACnet functionality is outside this RTU-to-TCP configuration.
主な特長
- Protocol scope: Modbus RTU to Modbus TCP variant
- RS485 interfaces: 4
- RS232 interface: 1
- USB interface: 1 OTG
- Dry-contact I/O: 3 inputs / 3 outputs
取り扱いモデル/構成
Use these configuration references for enquiry; confirm the exact specification before ordering.
| RITOKS configuration reference | 設定 | Selection notes |
|---|---|---|
| RTX-MGW4-RT | RTU-to-TCP gateway | Verify supported device map and firmware |
技術仕様
| Protocol scope | Modbus RTU to Modbus TCP variant |
|---|---|
| RS485 interfaces | 4 |
| RS232 interface | 1 |
| USB interface | 1 OTG |
| Dry-contact I/O | 3 inputs / 3 outputs |
| 供給 | 12–24 V DC |
| 寸法 | 144 × 90 × 63.5 mm |
| 動作温度 | −20 to +60 °C |
用途
AI-generated conceptual application context, not a photograph of an actual installation. Confirm equipment fit and circuit requirements for the selected configuration.

Building Plant Rooms
Connect compatible RTU devices to a supervisory TCP network.
Energy Monitoring Networks
Integrate meters only after checking register maps and polling limits.
産業用オートメーション
Review port assignments, network addressing and gateway configuration.
選考の際に確認すべき情報
- Device protocols, register maps and intended network topology
- Number of RTU devices and required polling rate
- Power supply and cabinet dimensions
- Firmware and commissioning requirements
よくある質問
What information is needed for a quotation?
Device protocols, register maps and intended network topology Please include quantity and destination.
What should be confirmed before selecting a configuration?
Port counts do not establish throughput or device capacity. BACnet functionality is outside this RTU-to-TCP configuration.
お見積りのお申し込み
正確な型番、必要な定格、数量、および配送先をお知らせください。お見積り前に、在庫状況と必要書類について確認させていただきます。.
Please include: Device protocols, register maps and intended network topology; Number of RTU devices and required polling rate; Power supply and cabinet dimensions.

